Laserfiche WebLink
1 <br />3.3 Bidders shall examine existing site improvements, and conditions, utilities, <br />and streets to determine all conditions which will affect the Work. <br />' 4. INTERPRETATION OF BIDDING DOCUMENTS <br />t <br />6.2 If requested by the Owner, the Bidder shall submit a certified financial <br />statement, prepared within the past 30 days, indicating current financial <br />resources, liabilities, capital equipment, and past history performance. <br />6.3 Bidders may be disqualified and their bids rejected for any of the following <br />specific reasons: <br />a. Reason to believe that collusion exists among Bidders. <br />b. Determination of lack of competency as may be revealed by <br />qualification statements, financial statements, experience records, or <br />other questionnaires. <br />1 07/03 00100 -2 03- 4138.A <br />4.1 <br />All questions requiring clarification or interpretation of the Bidding <br />' <br />Documents shall be made in writing and shall reach the office of the Owner <br />at least 5 days prior to the date for receipt of bids. Direct all requests to the <br />attention of the Project Engineer at Calvin, Giordano & Associates, Inc. (954) <br />921 -7781. <br />4.2 <br />Any modification or interpretation of the Bidding Documents will be made by <br />' <br />Addendum to all who are recorded by the Engineer as having received a <br />complete set of Bidding Documents. <br />' <br />4.3 <br />Interpretations or modifications of Bidding Documents made in any manner <br />other than by Addendum will not be binding. <br />' <br />4.4 <br />A Bidder, prior to submitting his Bid, shall ascertain that he has received all <br />Addenda issued, and shall acknowledge their receipt in the Bid Form. <br />' <br />5. SUBSTITUTIONS <br />5.1 <br />Bidders represent that their Bid is based upon the materials and equipment <br />described in the Bidding Documents. <br />5.2 <br />Requests for substitutions will be considered prior to receipt of bids if they <br />reach the Engineer at least 5 days prior to the date for receipt of bids. <br />5.3 <br />Acceptance by the Engineer of a proposed substitution will be issued in the <br />form of an Addendum or Substitution Request Form. <br />6. QUALIFICATION <br />OF BIDDERS <br />6.1 <br />If requested, the Bidder shall submit to the Engineer, prior to award of <br />contract, a properly completed Contractors Qualification Statement, along <br />' <br />with any other evidence of his satisfactory experience and ability to perform <br />the proposed Work. <br />t <br />6.2 If requested by the Owner, the Bidder shall submit a certified financial <br />statement, prepared within the past 30 days, indicating current financial <br />resources, liabilities, capital equipment, and past history performance. <br />6.3 Bidders may be disqualified and their bids rejected for any of the following <br />specific reasons: <br />a. Reason to believe that collusion exists among Bidders. <br />b. Determination of lack of competency as may be revealed by <br />qualification statements, financial statements, experience records, or <br />other questionnaires. <br />1 07/03 00100 -2 03- 4138.A <br />