My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-01-01) Sea Wall Replacement & Restoration
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 12:25:47 AM
Creation date
1/6/2011 11:55:55 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Sea Wall Replacement & Restoration
Bid No. (xx-xx-xx)
04-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. CONCRETE MIXING: <br />1) Ready -Mix Concrete from commercial supplier approved by FDOT. <br />Comply with requirements of FDOT Specifications, and as herein <br />specified. <br />3.5 EXECUTION: <br />A. GENERAL: <br />1) Coordinate the installation of joint materials with placement of forms and <br />reinforcing steel. <br />B. FORMS: <br />1) Design, erect, support, brace and maintain formwork to support vertical <br />and lateral, static, and dynamic loads that might be applied until such <br />loads can be supported by concrete structure. Construct formwork so <br />concrete members and structures are of correct size, shape, alignment, <br />elevation, and position. Maintain formwork construction tolerances <br />complying with ACI 347. <br />2) Fabricate forms for easy removal without hammering or prying against <br />concrete surfaces. Provide crush plates or wrecking plates where <br />stripping may damage cast concrete surfaces. <br />3) Place chamfer strips for exposed comers and edges as indicated. <br />4) Cleaning and Tightening: Thoroughly clean forms and adjacent surfaces <br />to receive concrete. Remove chops, wood sawdust, dirt or other debris <br />just before concrete is placed. Retightening forms and bracing after <br />concrete placement is required to eliminate mortar leaks and maintain <br />proper alignment. <br />TS -12 <br />RJCM&MISUNNYISLEYMCHSPECS <br />
The URL can be used to link to this page
Your browser does not support the video tag.