My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-01-01) Sea Wall Replacement & Restoration
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 12:25:47 AM
Creation date
1/6/2011 11:55:55 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Sea Wall Replacement & Restoration
Bid No. (xx-xx-xx)
04-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
location of concrete batch in structure, design compressive strength at <br />" 28 days, concrete mix proportions and materials, compressive breaking <br />strength and type of break for both 7 -days tests and 28 -day tests. <br />4.0 CONCRETE PILINGS AND PANELS <br />4.1 SCOPE: <br />The Work consists of furnishing all materials, labor, and equipment for the <br />installation of pre- stre °sed concrete piles and pre -cast concrete panels. <br />4.2 SITE CONDITIONS: <br />The site conditions including vegetation, utilities, and existing improvements <br />are indicated on the Drawings. <br />4.3 SOIL CONDITIONS: <br />A. The CONTRACTOR is advised that a subsurface /soils investigation is not <br />available. The CONTRACTOR is advised that it is in the best interest of <br />the CONTRACTOR to have a soil investigation conducted for the purpose <br />of determining pile and panel driving conditions and requirements. <br />B. The CONTRACTOR, if the CONTRACTOR so chooses, shall perform or <br />have performed at the CONTRACTOR'S expense, a soil investigation. <br />Said investigation shall be solely at the expense of the CONTRACTOR <br />and shall not be the expense of the OWNER or the ENGINEER. Should <br />the CONTRACTOR choose to have a soils investigation performed, the <br />CONTRACTOR shall provide to the ENGINEER and the OWNER copies <br />of the soils investigation report immediately upon completion. <br />C. As an alternate form of investigation, the CONTRACTOR may choose to <br />perform a minimum of two (2) test piles at the 183`d St. location. The <br />TS-17 <br />�' RJGO8MISUNNYISLESRECHSPECS <br />
The URL can be used to link to this page
Your browser does not support the video tag.