Laserfiche WebLink
Yom, <br />4 _ <br />9 <br />The project runs the length of the north side of the island as pictured above. The <br />revetment is composed of concrete bags stacked at approximately a 75 deg. angle. <br />The revetment has suffered two prominent fractures at the locations shown. The <br />fractures are a result of differential settlement of the revetment and washout of the soil <br />behind the wall. As remediation, the applicant proposes the installation of a stem wall <br />and a cast in place footer at the toe of the existing structure. The stem wall will prevent <br />migration of the soil under the structure and stabilize the supporting soil foundation. <br />The cast in place footer will distribute the vertical load over a wider base and prevent <br />differential settlement. <br />Client: City of Sunny Isles <br />Project: Atlantic Ave. Bridge Revetment <br />Sheet: Plan View of Project <br />