My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-01-01) Sea Wall Replacement & Restoration
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 12:25:47 AM
Creation date
1/6/2011 11:55:55 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Sea Wall Replacement & Restoration
Bid No. (xx-xx-xx)
04-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />L-1 <br />� I <br />responsibilities shall be the prevention of accidents and the <br />maintaining and supervising of safety precautions and pro- <br />grams. <br />Hazard Communicasion Programs: <br />6.22. CONTRACTOR shall be responsible for coordinating <br />any exchange of material safety data sheets or other hazard <br />communication information required to be made available to or <br />exchanged between or among employers at the site in accor- <br />dance with Laws or Regulations. <br />Emergencies: <br />6.23. In emergencies affecting the safety or protection of <br />persons or the Work or property at the site or adjacent <br />thereto, CONTRACTOR, without special instruction or au- <br />thorization from OWNER or ENGINEER, is obligated to <br />act to prevent threatened damage, injury or loss. CON - <br />TRACTOR shall give ENGINEER prompt written notice if <br />CONTRACTOR believes that any significant changes in the <br />Work or variations from the Contract Documents have been <br />caused thereby. If ENGINEER determines that a change in <br />the Contract Documents is required because of the action <br />taken by CONTRACTOR in response to such an emergency, <br />a Work Change Directive or Change Order will be issued to <br />document the consequences of such action. <br />6.24. Shop Drawings and Samples: <br />6.24.1. CONTRACTOR shall submit Shop Drawings to <br />ENGINEER for review and approval in accordance with the <br />accepted schedule of Shop Drawings and Sample submittals <br />(see paragraph 2.9). All submittals will be identified as <br />ENGINEER may require and in the number of copies <br />specified in the General Requirements. The data shown on <br />the Shop Drawings will be complete with respect to quanti- <br />ties, dimensions, specified performance and design criteria, <br />materials and similar data to show ENGINEER the materi- <br />als and equipment CONTRACTOR proposes to provide and <br />to enable ENGINEER to review the information for the <br />limited purposes required by paragraph 6.26. <br />6.24.2. CONTRACTOR shall also submit Samples to <br />ENGINEER for review and approval in accordance with <br />said accepted schedule of Shop Drawings and Sample sub- <br />mittals. Each Sample will be identified clearly as to material, <br />Supplier, pertinent data such as catalog numbers and the use <br />for which intended and otherwise as ENGINEER may <br />require to enable ENGINEER to review the submittal for <br />the limited purposes required by paragraph 6.26. The num- <br />bers of each Sample to be submitted will be as specified in <br />the Specifications. <br />6.:5. Submittal Procedures: <br />6.25.1. Before submitting each Shop Drawing or Sam- <br />ple, CONTRACTOR shall have determined and verified: <br />27 <br />6.25.1.1. all field measurements, quantities, dimen- <br />sions, specified performance criteria, installation require- <br />ments, materials, catalog numbers and similar information <br />with respect thereto, <br />6.25.1.2. all materials with respect to intended use, <br />fabrication, shipping, handling, storage, assembly and <br />installation pertaining to the performance of the Work, and <br />6.25.1?. all information relative to CONTRACTOR's <br />sole responsibilities in respect of means, methods, tech- <br />niques, sequences and procedures of construction and <br />safety precautions and programs incident thereto. <br />CONTRACTOR shall also have reviewed and coordinated <br />each Shop Drawing or Sample with other Shop Drawings <br />and Samples and with the requirements of the Work and the <br />Contract Documents. <br />6.25.2. Each submittal will bear a stamp or specific <br />written indication that CONTRACTOR has satisfied CON - <br />TRACPOR's obligations under the Contact Documents with <br />respect to CONTRACTOR'S review and approval of that <br />submittal. <br />6.25.3. At the time of each submission, CONTRACTOR <br />shall give ENGINEER specific written notice of such vari- <br />ations, if any, that the Shop Drawing or Sample submitted <br />may have from the requirements of the Contract Documents, <br />such notice to be in a written communication separate from <br />the submittal; and, in addition, shall cause a specific notation <br />to be made on each Shop Drawing and Sample submitted to <br />ENGINEER for review and approval of each such variation. <br />6.26. ENGINEER will review and approve Shop Drawings <br />and Samples in accordance with the schedule of Shop Draw- <br />ings and Sample submittals accepted by ENGINEER as re- <br />quired by paragraph 2.9. ENGINEER's review and approval <br />will be only to determine if the items covered by the submittals <br />will, after installation or incorporation in the Work, conform to <br />the information given in the Contract Documents and be <br />compatible with the design concept of the completed Project as <br />a functioning whole as indicated by the Contract Documents. <br />ENGINEER's review and approval will not extend to means, <br />methods, techniques, sequences or procedures of construction <br />(except where a particular means, method, technique, se- <br />quence or procedure of construction is specifically and ex- <br />pressly called for by the Contract Documents) or to safety <br />precautions or programs incident thereto. The review and <br />approval of a separate item as such will not indicate approval of <br />the assembly in which the item functions. CONTRACTOR <br />shall make corrections required by ENGINEER, and shall <br />return the required number of corrected copies of Shop Draw- <br />ings and submit as required new Samples for review and <br />approval. CONTRACTOR shall direct specific attention in <br />writing to revisions other than the corrections called for by <br />ENGINEER on previous submittals. <br />6.27. ENGINEER's review and approval of Shop Draw- <br />ings or Samples shall not relieve CONTRACTOR from respon- <br />sibility for any variation from the requirements of the Contract <br />
The URL can be used to link to this page
Your browser does not support the video tag.