My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-01-01) Sea Wall Replacement & Restoration
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 12:25:47 AM
Creation date
1/6/2011 11:55:55 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Sea Wall Replacement & Restoration
Bid No. (xx-xx-xx)
04-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Add the following after Paragraph 6.05.F: <br />G. The use of asbestos or asbestos -based fiber materials is prohibited in this Project. <br />Add the following after Paragraph 6.08: <br />6.08.A. The OWNER will secure and pay for only the following governmental charges and <br />inspection fees: <br />a. special assessments, <br />b. capital connection fees, <br />c. threshold and special inspection fees, <br />d. permanent utility meter installation fees, <br />e. permanent utility hook -up fees, and <br />f. impact fees. <br />6.08.6. CONTRACTOR shall pay for all building permits and charges of utility owners for <br />connections to the Work, and OWNER will pay charges of such utility owners for capital costs <br />related thereto such as plant investment fees. <br />Delete the last sentence of Paragraph 6.12. and substitute the following: 'These shall be <br />available to ENGINEER for examination during construction and shall be delivered "to <br />ENGINEER for OWNER upon Substantial Completion of the Work." <br />' At the end of Paragraph 6.13.6, add the following sentences: 'The Occupational Safety and <br />Health Administration excavation safety standards, 29 CFR 1926.650 Subpart P trench safety <br />standards are in effect during the period of construction of the Project. In compliance with <br />' current State of Florida statutes, the Contractor or subcontractor performing trench excavation <br />work on the Project shall comply with the applicable trench safety standards." <br />' In the sixth line of Paragraph 6.20.A., change the parenthetical insert to read as follows: <br />"...(including but not limited to fees and charges of ENGINEER, other engineers, architects, <br />attorneys and other professionals, particularly including, but not limited to reasonable <br />ENGINEER's attorney's fees, and court costs)... ". <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION <br />Change the first sentence of Paragraph 9.01.A. to read as follows: "If OWNER and ENGINEER <br />agree, ENGINEER will be OWNER's representative during the construction period." <br />ARTICLE 10 - CHANGES IN THE WORK; CLAIMS <br />Add the following: <br />10.06. Without invalidating the agreement, Owner may, at any time execute appropriate <br />Change Orders for additions and /or deletions in the work of up to 25% of the total contract <br />amount, without a change in the contract unit prices bid. <br />03/03 00800 -5 03 -4122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.