My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 04-04-01 Structured Cabling System
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:21:45 AM
Creation date
1/6/2011 2:16:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Structured Cabling System
Bid No. (xx-xx-xx)
04-04-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum 1 <br />This addendum is issued to clarify and correct information in the original bid package, as <br />a result of the pre -bid conference held Monday, April 26. <br />Must the system be designed to meet manufacturer's warranty requirements? If <br />so, can the appropriate manufacturer components be substituted for those <br />specified in the RFP? <br />➢ Yes, the system must be designed to meet manufacturer warranty <br />requirements, and appropriate manufacturer components may be <br />substituted for those specified in the RFP in order to meet the <br />manufacturer warranty requirements. <br />2. The RFP specifies 50 or 100 pair Cat5e to be installed as part of the backbone <br />riser cable. Cat5e is only sold in 25 -pair cable. Should multiple 25 -pair cables be <br />used to meet the 50/100 pair requirement? <br />➢ Yes, multiple 25 -pair cables should be used to meet the pair quantity <br />specified in the RFP. <br />3. Will grounding be provided or must the vendor provide grounding of all racks, <br />ladders, etc? <br />➢ All telco backboards will have grounding provided as specified in the <br />architectural plans (see section 14.20 of the RFP). However, all sites <br />requiring rack/ladder installations will not necessarily have grounded <br />backboards installed. Vendor is responsible for proper grounding of <br />installation. <br />4. Is plenum cable required for installation? <br />➢ Yes, all cable installed must be plenum rated. <br />5. Must all fiber cable be run inner -duct? <br />➢ As specified in section 10.2.2 of the RFP, all fiber cable must be run <br />inner -duct unless otherwise recommended by the manufacturer. <br />6. Please clarify the conference room modular outlet requirements depicted in <br />diagram 14.2? <br />➢ The eight (8) conference room locations depicted in diagram 14.2 shall <br />have a total of 6 cables each. Four (4) cables shall be home run to telco <br />closet 2 -009, and an additional two (2) cables shall be home run to the PD <br />computer room. <br />7. Which sheets should vendors receive from Miami T- square when they pick up the <br />architectural drawings (see section 14.20 of the RFP)? <br />➢ The following electrical sheets: <br />i. E.2.311 <br />ii. E.2.312 <br />iii. E.2.321 <br />iv. E.2.322 <br />v. E.2.331 <br />vi. E.2.341 <br />vii. E.0.100 (legend) <br />viii. E.0.300 (additional notes) <br />
The URL can be used to link to this page
Your browser does not support the video tag.