Laserfiche WebLink
Addendum 2 <br />' This addendum is issued to clarify and correct information in the original bid package. <br />iQuestions /Answers <br />1, As shown in section 14, there is passive equipment (ie, 48 port cat 6 patch panels) <br />' that the contractor is to provide. However, there is also active equipment (ie, <br />Procurve 2824, SU2200RNIXL,U SUR48R3XLBP) that is not clear /specified in <br />any part of the RFP. Are we to provide those items for the City or will the City <br />provide those items as a customer purchase? <br />The contractor will only be providing passive equipment as part of this <br />RFP. All active equipment will be purchased separately by the City, and <br />is only shown in diagrams for clarification and planning purposes (ie, for <br />vendor to determine rack layout in order to provide proper length patch <br />cords). Contractor will be providing only passive equipment, with the <br />exception of cabinets, which will also be provided by the City <br />