My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications & Add.#1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-05-01) Samson O. Pk Landsc. & Lighting
>
Specifications & Add.#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:18:23 AM
Creation date
1/7/2011 10:22:52 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Samson O. Pk. Lands. & Lighting
Bid No. (xx-xx-xx)
04-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t a <br />1 05/04 <br />6.3 Bidders may be disqualified and their bids rejected for any of the following <br />specific reasons: <br />a. Reason to believe that collusion exists among Bidders. <br />b. Determination of lack of competency as may be revealed by <br />qualification statements, financial statements, experience records, or <br />other questionnaires. <br />C. The Bidder's uncompleted work load which in the judgement of the <br />Owner, may cause detrimental impact on prompt completion of this <br />project. <br />d. The Bidder is involved in any litigation against the Owner. <br />e. The Bidder has defaulted on any previous contract or is in arrears on <br />any existing contract. <br />f. The submittal of more than one proposal from an individual, firm, <br />partnership, corporation or association under the same or different <br />names. <br />6.4 It shall be a requirement of this bid that there are no related party <br />transactions between the bidder and any employee, agent or contractor of <br />the City of Sunny Isles Beach. Any bidder who is a related party, as noted <br />herein, will be considered nonresponsive and the proposal and bid bond will <br />be immediately returned. A bidder will be considered a related party if the <br />bidder has an ownership interest or is in any way related to an employee, <br />agent, consultant or contractor of the City, is a sub - consultant of an <br />employee, agent, consultant or contractor, and can influence the <br />management or operating policy of the other to an extent that one of the <br />transacting parties might be prevented from fully pursuing its own separate <br />interests. <br />PERFORMANCE OF WORK BY CONTRACTOR: <br />7.1 The Contractor shall perform on the site and with his own forces, work <br />equivalent to at least forty percent (40 %) of the total amount of work to be <br />performed under this contract. After the contract is awarded, and during the <br />progress of the work, the Owner reserves the right to reduce the percentage <br />of work performed by the contractor's own forces. <br />BID PREPARATION <br />8.1 Prepare bids on the forms provided by the Engineer with all blanks on the Bid <br />Form filled in by typewriter or written in ink. <br />8.2 State total base bid amount in both words and figures. In case of a <br />discrepancy between the two, the amount written in words shall govern. <br />00100 -3 03 -4465 <br />
The URL can be used to link to this page
Your browser does not support the video tag.