My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-07-01) Roadway Lighting Improv. NE 159TH ST. & NE 174TH ST.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2011 12:03:54 PM
Creation date
1/10/2011 9:58:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Roadway Lighting Improv.
Bid No. (xx-xx-xx)
04-07-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION 01021 <br /> <br />CASH ALLOWANCES <br /> <br />PART 1 - GENERAL <br />1.01 REQUIREMENTS INCLUDED <br /> <br />A. Schedule of monetary amounts of allowances in Contract Sum for purchase <br />products. <br /> <br />B. Costs in Contact Sum other than in Allowance. <br /> <br />C. Procedures for administration of Allowances. <br /> <br />1.02 RELATED REQUIREMENTS <br /> <br />A. Document 00700: General Conditions. <br /> <br />B. Section 01410: Testing and Testing Laboratory Services. <br /> <br />1.03 COSTS INCLUDED IN ALLOWANCES <br /> <br />A. Cost of product to Contractor, less applicable trade discounts. <br /> <br />B. Delivery to site. <br /> <br />C. Applicable taxes. <br /> <br />D. Products handling at site, including unloading, uncrating, and storage. <br /> <br />E. Protection of products from elements and from damage. <br /> <br />F. Labor and installation and finishing, except when installation is specified as <br />part of allowance. <br /> <br />G. Other expenses required to complete installation. <br /> <br />H. Contractor overhead and profit. <br /> <br />1.04 CONTRACTOR RESPONSIBILITIES <br /> <br />A. Promptly notify Engineer of any reasonable objections from supplier. <br /> <br />07/04 <br /> <br />01021-1 <br /> <br />03-4174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.