My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-07-01) Roadway Lighting Improv. NE 159TH ST. & NE 174TH ST.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2011 12:03:54 PM
Creation date
1/10/2011 9:58:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Roadway Lighting Improv.
Bid No. (xx-xx-xx)
04-07-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I___~m__ <br />I <br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION 01100 <br /> <br />ALTERNATES <br /> <br />PART 1 - GENERAL <br /> <br />1.01 REQUIREMENTS INCLUDED <br /> <br />A. This section identifies procedures for proposing Alternates, and describes <br />the basic changes to be incorporated into the Work, only when that <br />Alternate is made a part of the Work by specific provisions in the Owner- <br />Contractor Agreement. <br /> <br />1.02 RELATED REQUIREMENTS <br /> <br />A. Bidding Documents: Method of quotation of the cost of each Alternate, and <br />the basis of the Owner's acceptance of Alternates. <br /> <br />B. Owner-Contractor Agreement: Incorporation of Alternates into the Work. <br /> <br />C. Sections of the Specifications as listed under the respective Alternates. <br /> <br />D. Referenced sections of Specifications stipulate pertinent requirements for <br />products and methods to achieve the work stipulated under each Alternate. <br /> <br />E. Coordinate pertinent related work and modify surrounding work as required <br />to properly integrate the work under each Alternate, and to provide the <br />complete construction required by Contract Documents. <br /> <br />1.03 PROCEDURES <br /> <br />A. Alternates will be exercised at the option of the Owner. <br /> <br />B. Coordinate related work and modify surrounding work as required to <br />complete the Work, including changes under each Alternate, and to provide <br />the complete construction required by Contract Documents. <br /> <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br /> <br />END OF SECTION <br /> <br />07/04 <br /> <br />01100-1 <br /> <br />03-4174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.