My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-07-01) Roadway Lighting Improv. NE 159TH ST. & NE 174TH ST.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2011 12:03:54 PM
Creation date
1/10/2011 9:58:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Roadway Lighting Improv.
Bid No. (xx-xx-xx)
04-07-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1.02 RELATED REQUIREMENTS <br /> <br />A. Document 00700: Standard General Conditions of the Construction <br />Contract <br />B. Section 01720: Project Record Documents <br />C. Designate in the construction schedule, or in a separate coordinated <br />schedule, the dates for submission and the dates that reviewed Shop <br />Drawings, Working Drawings, and Samples will be needed. <br /> <br />1.03 CONTRACTOR'S RESPONSIBILITY <br /> <br />07/04 <br /> <br />A. It is the duty of the Contractor to check all drawings, data and samples <br />prepared by or for him before submitting them to the Engineer for review. <br />Each and every copy of the Drawings and data shall bear Contractor's <br />stamp will be returned to the Contractor for conformance with this <br />requirement. Shop drawings shall indicate any deviations in the submittal <br />from requirements of the Contract Documents. <br /> <br />B. Determine and verify: <br /> <br />1. Field measurements <br />2. Field construction criteria <br />3. Catalog numbers and similar data <br />4. Conformance and Specifications <br /> <br />C. The Contractor shall furnish the Engineer a schedule of Shop Drawing <br />submittals fixing the respective dates for the submission of shop and <br />working drawings, the beginning of manufacture, testing and installation of <br />materials, supplies, and equipment. This schedule shall indicate those <br />that are critical to the progress schedule. <br /> <br />D. The Contractor shall not begin any of the work covered by a drawing, <br />data, or a sample returned for correction until a revision or correction <br />thereof has been reviewed and returned to him, by the Engineer <br />approved. <br /> <br />E. The Contractor shall submit to the Engineer all drawings and schedules <br />sufficiently in advance of construction requirements to provide no less <br />than twenty-one (21) calendar days for checking and appropriate action <br />from the time the Engineer receives them. <br /> <br />F. The Contractor shall submit two (2) copies of descriptive or product data <br />submittals to complement shop drawings for the Engineer plus the number <br />of copies which the Contractor requires. The Engineer will retain two (2) <br />sets. All blueprint shop drawings shall be submitted with one (1) set of <br />reproducible and four (4) sets of print. <br />The Engineer will review the drawings and return to the Contractor the set <br />of marked-up drawings with appropriate review comments. <br /> <br />01340-2 <br /> <br />03-4174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.