Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />NE 159TH STREET & NE 174TH STREET ROADWAY LIGHTING IMPROVEMENTS <br />Bid Estimated <br />Item Description Quantity Unit Unit Price Estimated Total <br /> <br />General <br />Mobilization per FDOT item 101-1 (< 5%) <br />2 Maintenance of Traffic Per Plans <br /> <br />Sub-Total General <br /> <br />II <br /> <br />Electrical <br />3 Installation of City Furnished Single Pole Mounted <br />Fixture Assembly <br />4 Installation of City Furnished Twin Pole Mounted <br />Fixture Assembly <br />5 Precast Concrete Base <br /> <br />17 EA <br />26 EA <br />2 EA <br />19 EA <br />2 EA <br /> <br />9 EA <br /> <br />6 Service Rack <br /> <br />7 Pull Boxes <br /> <br />8 FPL Furnished Handhole <br /> <br />9 Conduit and Wire to include Pavement and Site <br />Restoration <br /> <br />Sub-Total Electrical <br /> <br />TOTAL BASE BID (Item I Thru II) <br /> <br />Written <br /> <br />(Contractor) <br /> <br />07/04 <br /> <br />00300-2 <br /> <br />LS <br />LS <br /> <br />LS <br /> <br />1$ <br /> <br />I <br /> <br />(Date) <br /> <br />03-4174 <br />