My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Horsepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-07-01) Roadway Lighting Improv. NE 159TH ST. & NE 174TH ST.
>
Responses
>
Horsepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2011 11:56:53 AM
Creation date
1/10/2011 10:15:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
NE 159TH ST. & NE 174TH ST. Roadwyay Lighting Improv.
Bid No. (xx-xx-xx)
04-07-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br /> <br />DOCUMENT 00403 <br /> <br />TRENCH SAFETY ACT <br /> <br />(90-96, Laws of Florida) <br /> <br />Bidder acknowledges that included in the appropriate bid items of the proposal and in the <br />Total Bid Price are costs for complying with the Florida Trench Safety Act (90-96, Laws of <br />Florida) effective October 1, 1990. The bidder further identifies the costs of such <br />compliance to be summarized below: <br /> <br />Trench Safety <br />Measure <br />(Description <br /> <br />Unit <br />(Quantity) <br /> <br />Unit <br />Cost <br /> <br />A. <br /> <br /> <br />Total $ <br /> <br />B. <br />C. <br />D. <br /> <br />Extended <br />Cost <br /> <br />If applicable, the Contractor certifies that all trench excavation done within his control in <br />excess of five feet in depth shall be in accordance with the Florida Department of <br />Transportation's Special Provisions Article 125-1 and Subarticle 125-4.1 (TRENCH <br />EXCAVATION SAFETY SYSTEM AND SHORING, SPECIAL - TRENCH EXCAVATION). <br /> <br />Failure to complete the above may result in the bid being declared non-responsive. <br /> <br />Contractor agrees that the above safety compliances and costs are included In his bid <br />package. <br /> <br /> <br />I UA~~~~~ <br /> <br />of Bidding C <br /> <br />END OF DOCUMENT <br /> <br />07/04 <br /> <br />00403-1 <br /> <br /> <br />03-4174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.