My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Horsepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-07-01) Roadway Lighting Improv. NE 159TH ST. & NE 174TH ST.
>
Responses
>
Horsepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2011 11:56:53 AM
Creation date
1/10/2011 10:15:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
NE 159TH ST. & NE 174TH ST. Roadwyay Lighting Improv.
Bid No. (xx-xx-xx)
04-07-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Horsepower Electric, Inc. <br />April 26, 2004 <br />Page Two <br /> <br /> <br />x <br /> <br />Please be advised the Department of Transportation has considered your <br />company's qualification in all work classes requested. We have evaluated <br />your company's organization, management, work experience, work performance <br />and ad~quacy of equipment as directed by section 14-22.003, Florida <br />Administrative Code. Based on this evaluation, the Department is not able, <br />at this time, to prequalify your company for the work classes: Grading, <br />Draina e, Flexible Pavin , Portland Cement Concrete Pavin , Fencin , <br />Guardrail, Grassing, Seeding, Sodding, Landscaping and Pavement Markings. <br /> <br />You may apply, in writing, for a Revised Certificate of Qualification at any <br />time prior to the expiration date of this certificate according to Section <br />14-22.0041(3), Florida Administrative Code. Please be advised if <br />certification in additional classes of work is desired, documentation is <br />needed to show that your company has done such work with your own forces and <br />equipment or that experience was gained with another contractor and that you <br />have the necessary equipment for each additional class of work requested. <br />Also, refer to the note at the bottom of Page 16 of the Application for <br />Qualification when supplying additional information. <br /> <br />~~~/ <br /> <br /> <br />L.PI Juani ta Moore, Manager <br />~~ , Contracts Administration Office <br /> <br />JM:vas <br /> <br />12/89 <br />(SEE NOTES ON REVERSE SIDE) <br />
The URL can be used to link to this page
Your browser does not support the video tag.