My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 04-08-01 Security System for SIB Gov. Ctr.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 3:01:20 AM
Creation date
1/11/2011 9:08:19 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Security System for SIB Gov. Ctr.
Bid No. (xx-xx-xx)
04-08-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18.2 It is the intent of the City to award a Contract to the lowest responsible Total <br />Base Bidder whose Bid is in conformance with the Bidding Documents and does <br />not exceed the funds available. <br />18.3 Upon acceptance of a Bid and award of the Contract, the successful Bidder shall <br />deliver the executed Contract, along with required bonds and any other items re- <br />quested, to the City within 10 days. Failure to do so will be deemed as a breach <br />of agreement by the Bidder and result in forfeiture of bid security as described in <br />the Instructions to Bidders. <br />18.4 The City reserves the right to hold all proposals and bid guarantees for a period <br />not to exceed 90 days after the date of bid opening stated in the Advertisement <br />for Bids. <br />18.5 The award of the contract, if it is awarded, will be to the most responsible bidder <br />whose qualifications indicate the award will be to the best interest of the City and <br />whose proposal shall comply with the requirements of the Contract Documents. <br />Time is of the essence for this project and the time limits set in the proposal, if <br />set by the bidder, will be accorded weight by the City in the determination of the <br />best proposal. <br />18.7 If the Contractor feels that there is a problem either prior to, or during, the bid <br />opening, he shall contact the City (within 24 hours of the bid opening) and follow <br />the City's current policy for bid protests. <br />18.8 The City reserves the right to award as a total contract any combination of the <br />Unit Price Bid Schedule Items that would be in the best interest of the City. <br />END OF SECTION <br />07/04 00100 -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.