Laserfiche WebLink
B. The Contractor shall be responsible for all materials, equipment, and supplies sold and delivered <br />to the Owner under this contract until final inspection of the work and acceptance thereof by the <br />Owner. In the event that any such material, equipment, or supplies are lost, stolen, damaged, <br />or destroyed prior to final inspection and acceptance, the Contractor shall replace same without <br />additional cost to the Owner. <br />3.6. TEST AND PERFORMANCE VERIFICATION <br />A. Performance testing and adjustment procedures for the system(s) shall include: <br />1. Each device is to be tested for full functionality and operation as a system. Verification of <br />all alarm displays, annunciations, and printouts is required. <br />2. Perform all tests and verifications in the presence of the Architect, Consultant or owner as <br />required. Provide written proof of compliance with the test and demonstration of the system <br />performance. <br />B. If the need for additional adjustment becomes evident during demonstrations and testing, the <br />Installer's work shall continue until the system(s) operates properly. If final acceptance is <br />delayed because of defective equipment or because installation is not in accordance with these <br />specifications, the Installer shall pay for all additional time and expenses during any extensions <br />of the acceptance - testing period. <br />END OF SECTION <br />8/04 17715 -6 <br />