Laserfiche WebLink
D. System should be network -ready using standard Ethernet/Fast Ethernet UTP connection. <br />E. System shall have the capability to send e-mail and /or page in the event of camera loss or <br />programmed event. <br />F. System must be scalable by "daisy- chaining" or similar method to allow for future expansion. <br />G. System must be capable of easily exporting stored video for law enforcement use. <br />H. Acceptable products: <br />1. American Dynamics DigiMux <br />2. or approved equal <br />2.4. POWER SUPPLY <br />A. System installer shall provide power supply units as necessary to make the system complete <br />and functional. Power supplies may be required for main and remote equipment. Power supplies <br />are to be selected to match source and load voltages, frequency, wattage and environment for <br />equipment powered. Sufficient capacity shall be included in power supplies to accommodate <br />reasonable and expected future requirements. Power supply shall be U.L. listed. <br />B. Power supply enclosure shall be suitable for location used. Power supplies are to be located in <br />central communications closets along with DVR units. <br />C. Provisions shall be made for the continuous operation of the full system upon loss of normal <br />power. Standby batteries, UPS system, or both shall provide power for minimum of 24 hours for <br />remote devices, and 30 minutes for servers, monitors and common equipment. Generator <br />standby power (not provided by security installer) shall provide emergency long -term power. <br />2.5. EQUIPMENT HOUSING <br />A. Equipment housing shall be provided where indicated on the drawings and as needed to house <br />security equipment and control system components such as programmable logic controllers, <br />wiring terminations, power supplies, auxiliary relays, etc. <br />PART 3 EXECUTION <br />3.1. SECURITY EQUIPMENT CABINET INSTALLATION <br />A. Coordinate installation of equipment cabinets with millwork construction with respect to <br />dimensions, installation and accessibility. Full accessibility must be maintained as required by <br />the National Electrical Code. <br />B. Wall hung cabinets shall have adequate wall blocking to support full weight of cabinets and <br />installed equipment. <br />C. Power and cabling shall be coordinated to enter cabinets without producing trip hazards. <br />3.2. ADDITIONAL SYSTEM PROGRAMMING NOTES <br />A. Provide fully functional and programmed system(s) to Owner's requirements. <br />3.3. WIRING INSTALLATION <br />8/04 17725 -5 <br />