My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ADT #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 04-08-01 Security System for SIB Gov. Ctr.
>
ADT #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2011 9:48:41 AM
Creation date
1/13/2011 9:47:18 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Security System for SIB Gov. Ctr.
Bid No. (xx-xx-xx)
04-08-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SECTION 17715 <br /> <br />DURESS SYSTEM <br /> <br />PART 1 GENERAL <br /> <br />1.1. SCOPE <br /> <br />A, This section of the specifications requires the complete installation of the system as indicated <br />on the drawings and/or specified herein. <br /> <br />B, Furnish, install, and deliver materials required to make the systems complete and of <br />professional quality, including any miscellaneous items necessary for proper operation, but not <br />specifically mentioned. Provide all labor and supervision to check out, adjust and calibrate total <br />system. The only exemptions are items specifically listed as "work by others". <br /> <br />C. Confirm voltage and frequency of systems and components and match with facility power <br />distribution system. Confirm all electrical standards for the country of concern to be acceptable, <br />This includes US standards organizations such as EIA (Electronic Industries Association) or <br />International standards bodies such as CCIR (International Radio Consultative Committee). <br /> <br />1,2. PREFABRICATION INSTALLATION MEETINGS <br /> <br />A. Prior to fabrication and system(s) installation, coordinate with the Architect and Owner to insure <br />system(s) work with building components, specifically including, but not limited to, the building <br />fire management system. <br /> <br />B. Verify all site conditions prior to installation, and coordinate work with the Architect and Owner <br />to assure a timely installation, The Security System Installer shall abide by any and all local <br />codes, manufacturers recommendations, safe work practices and shall secure any or all <br />applicable permits or licenses to complete said work, <br /> <br />1.3. SUBMITTALS <br /> <br />A. Submit for approval, within 30 days of award of contract or as required by Owner's schedule, but <br />prior to purchase or fabrication of equipment, 5 copies of the following: <br /> <br />1, A complete equipment list, with model numbers, manufacturers, quantities, and <br />specification "cut" sheets of all equipment used, broken down by system, <br /> <br />2, Equipment layout drawings for each room, with model numbers, <br /> <br />3. Proposed construction details for any custom built equipment. Drawings of custom panels <br />and labeling. Include proposed labels and layouts for switch panels, pictorial panels, and <br />receptacle plates. <br /> <br />4. Total systems block diagrams broken down by system. Drawings should include proposed <br />terminal block numbers, cable types and sizes, device location labeling, and wiring <br />diagrams for proposed switching systems and custom electronics. <br /> <br />5. Provide any revision to the Contract drawings, showing any relocation of devices, cabling, or <br />circuiting that may be warranted. <br /> <br />6. Warranty statement with proper dates filled in at the time of final acceptance. <br /> <br />8/04 <br /> <br />17715-1 <br /> <br />SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.