Laserfiche WebLink
' 17.5 In the event of a timely protest, the City Manager or his /her designee shall stay the award <br />of the contract unless, after consulting with the City Attorney and the affected director, <br />' he /she determines that the award of the contract without delay is necessary to protect <br />substantial interests of the city. <br />' 17.6 The city shall require a deposit from a protester to compensate the City for the expenses <br />of administering the protest. If the protest is decided in the protester's favor, the entire <br />deposit shall be returned to the protester. If the protest is not decided in the protester's <br />favor, the deposit shall be forfeited to the city. The deposit shall be in the form of a <br />' cashier's check and shall be in the amount of 1% of the amount of the pending award, <br />with a minimum deposit of $500 and a maximum deposit of $10,000. <br />' 18. CONTRACT AWARD AND EXECUTION <br />18.1 Until final award of Contract, the Owner reserves the right to reject any and all Bids, with <br />' or without cause; to waive any informality or irregularity; or to accept the Bid which is in <br />the best interest of the Owner. <br />' 19. CASH ALLOWANCES <br />19.1 The Bidder is advised that a space is provided in the Bid Form, Document 00300, for this <br />' purpose only. The Contractor shall not proceed on any additional work to be covered by <br />allowances until authorized in writing by the Engineer. Such work shall be approved by <br />1 12/04 00100 -7 03 -4138 <br />18.2 It is the intent of the Owner to award a Contract to the lowest responsible Total Base <br />' <br />Bidder whose Bid is in conformance with the Bidding Documents and does not exceed <br />the funds available. <br />' <br />18.3 Upon acceptance of a Bid and award of the Contract, the successful Bidder shall deliver <br />the executed Contract, along with required bonds and any other items requested, to the <br />' <br />Owner within 10 days. Failure to do so will be deemed as a breach of agreement by the <br />Bidder and result in forfeiture of bid security as described in the Instructions to Bidders. <br />18.4 The Owner reserves the right to hold all proposals and bid guarantees for a period not to <br />' <br />exceed 90 days after the date of bid opening stated in the Advertisement for Bids. <br />18.5 The award of the contract, if it is awarded, will be to the lowest responsible total base <br />' <br />bidder whose qualifications indicate the award will be to the best interest of the Owner <br />and whose proposal shall comply with the requirements of the Contract Documents. <br />Time is of the essence for this project and the time limits set in the proposal, if set by the <br />bidder, will be accorded weight by the Owner in the determination of the best proposal. <br />' <br />In no case will the award be made until all necessary investigations have been made into <br />the responsibility of the low bidder and the Owner is satisfied that the bidder is qualified <br />to do the Work and have the necessary organization, capital and equipment to carry out <br />' <br />the provisions of the contract to the satisfaction of the Owner within the time specified. <br />18.7 If the Contractor feels that a problem exists either prior to, or during the bid opening, he <br />shall contact the City (within 24 hours of the bid opening) and follow the Citys' current <br />policy for bid protests. <br />18.8 The Owner reserves the right to award as a total contract any combination of the Unit <br />Price Bid Schedule Items that would be in the best interest of the Owner. <br />' 19. CASH ALLOWANCES <br />19.1 The Bidder is advised that a space is provided in the Bid Form, Document 00300, for this <br />' purpose only. The Contractor shall not proceed on any additional work to be covered by <br />allowances until authorized in writing by the Engineer. Such work shall be approved by <br />1 12/04 00100 -7 03 -4138 <br />