Laserfiche WebLink
' 1. Maintain one set of complete instructions at the job site during installation and <br />until completion. <br />' B. Handle, install, connect, clean, condition and adjust products in strict accord with such <br />instructions and in conformity with specified requirements. <br />' 1. Should job conditions or specified requirements conflict with manufacturer's <br />instructions, consult with Engineer for further instructions. <br />2. Do not proceed with work without clear instructions. <br />C. Perform work in accord with manufacturer's instructions. Do not omit any preparatory <br />step or installation procedure unless specifically modified or exempted by Contract <br />Documents. <br />1.05 TRANSPORTATION AND HANDLING <br />A. Arrange deliveries of Products in accord with construction schedules, coordinate to avoid <br />conflict with work and conditions at the site. <br />Deliver Products in undamaged condition, in manufacturer's original containers or <br />packaging, with identifying labels intact and legible. <br />1 12/04 01600 -2 03 -4138 <br />product and to form an opinion as to its conformity to the specifications. The data shall <br />comply with Paragraph 1.07 of this Section. <br />' <br />C. <br />Facilities and labor for handling and inspection of all materials and equipment shall be <br />furnished by the Contractor. If the Engineer requires, either prior to beginning or during <br />progress of the work, the Contractor shall submit samples of materials for such special <br />' <br />tests as may be necessary to demonstrate that they conform to the specifications. Such <br />samples shall be furnished, stored, packed, and shipped as directed at the Contractor's <br />expense. <br />D. <br />The Contractor shall submit data and samples sufficiently early to permit consideration <br />' <br />and approval before materials are necessary for incorporation in the work. Any delay of <br />approval resulting from the Contractor's failure to submit samples or data promptly shall <br />not be used as a basis of claim against the Owner or the Engineer. <br />E. <br />In order to demonstrate the proficiency of workmen or to facilitate the choice among <br />several textures, types, finishes, and surfaces, the Contractor shall provide such samples of <br />workmanship or finish as may be required. <br />F. <br />The materials and equipment used on the work shall correspond to the approved samples <br />or other data. <br />' <br />1.04 MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION <br />A. <br />When Contract Documents require that installation of work shall comply with <br />manufacturer's printed instruction, obtain and distribute copies of such instructions to <br />parties involved in the installation, including copies to the Engineer. <br />' 1. Maintain one set of complete instructions at the job site during installation and <br />until completion. <br />' B. Handle, install, connect, clean, condition and adjust products in strict accord with such <br />instructions and in conformity with specified requirements. <br />' 1. Should job conditions or specified requirements conflict with manufacturer's <br />instructions, consult with Engineer for further instructions. <br />2. Do not proceed with work without clear instructions. <br />C. Perform work in accord with manufacturer's instructions. Do not omit any preparatory <br />step or installation procedure unless specifically modified or exempted by Contract <br />Documents. <br />1.05 TRANSPORTATION AND HANDLING <br />A. Arrange deliveries of Products in accord with construction schedules, coordinate to avoid <br />conflict with work and conditions at the site. <br />Deliver Products in undamaged condition, in manufacturer's original containers or <br />packaging, with identifying labels intact and legible. <br />1 12/04 01600 -2 03 -4138 <br />