Laserfiche WebLink
1 <br />1 <br />PART 2 - PRODUCTS (Not Applicable) <br />PART 3 - EXECUTION <br />3.01 FINAL CLEANING <br />A. Remove temporary protection and facilities installed for protection of the Work during <br />construction. <br />B. Comply with regulations of authorities having jurisdiction and safety standards for <br />cleaning. Do not burn waste materials. Do not bury debris or excess materials on the <br />Owner's property. Do not discharge volatile, harmful or dangerous materials into <br />drainage systems. Remove waste materials from the site and dispose of in a lawful <br />manner. <br />C. Where extra materials of value remaining after completion of associated Work have <br />become the Owner's property, arrange for disposition of these materials as directed. <br />12/04 <br />END OF SECTION <br />01700 -5 <br />03 -4138 <br />