My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-01) Fencing & Curbing Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:57:31 AM
Creation date
1/13/2011 10:58:44 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Fencing & Curbing Improv.
Bid No. (xx-xx-xx)
04-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 01730 <br />O & M REVIEW CHECKLIST <br />EQUIPMENT SUBMITTED DATE OF SUBMITTAL <br />MANUFACTURER DEGREE OF APPROVAL <br />SPECIFICATION SECTION DRAWING NUMBER <br />Is submittal correct for model /series /configuration originally submitted with shop <br />drawings? <br />Is binding correct with assigned color /printing etc.? <br />(Pertains to final three volumes) <br />Is submittal properly indexed? <br />Does submittal pertain only to equipment being furnished? <br />Is submittal easily understood and instructively arranged? <br />Does submittal include start -up, shutdown and trouble - shooting procedures? <br />Are sufficient drawings and schematics included to supplement written descriptions? <br />Is listing of name plate data for each piece of equipment supplied provided and attached? <br />Are all drawings provided printed on paper which is 11 inches high and folded to 8 1/2 <br />inches wide? <br />Is proper and complete instruction for servicing included? <br />Is there a suggested operating log sheet for equipment? <br />Is schedule for lubrication provided? <br />Is there a recommended preventative maintenance schedule? <br />Are necessary safety precautions clearly indicated where they relate to the equipment? <br />Is area representative information provided, i.e., Name, Address, Telephone Number? <br />Are specified spare parts indicated and listed? <br />The following are points of rejection necessitating resubmittal by Contractor: <br />END OF SECTION <br />12/04 01730 -8 03 -4138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.