My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-01) Fencing & Curbing Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:57:31 AM
Creation date
1/13/2011 10:58:44 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Fencing & Curbing Improv.
Bid No. (xx-xx-xx)
04-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 SECTION 02100 <br />' SITE PREPARATION <br />PART1- GENERAL <br />' 1.01 SCOPE OF WORK <br />' A. This Section covers clearing and grubbing of the construction site as specified herein. <br />B. Clear and grub the area within the limits of construction as required. The ENGINEER shall <br />' establish the length and width of the area to be cleared and grubbed prior to the beginning <br />of any work. <br />PART 2 - PRODUCTS (Not Used) <br />' PART 3 - EXECUTION <br />3.01 CLEARING <br />A. The surface of the ground for the area to be cleared and grubbed shall be completely <br />' cleared, as indicated on the plans, as well other objectionable obstructions resting on or <br />protruding through the surface of the ground. However, those trees that are designated on <br />the plans to remain shall be preserved as hereinafter specified. Clearing operations shall be <br />conducted so as to prevent damage to existing structures and installations, and to those <br />under construction, so as to provide for the safety of employees and others. Clearing for <br />structures shall consist of topsoil, vegetation and lime sludge removal. <br />t3.02 GRUBBING <br />' A. Grubbing shall consist of the complete removal of all stumps, roots larger than 1 1/2 inches <br />in diameter, matted roots, brush, timber, logs and any other organic or metallic debris <br />resting on, under or protruding through the surface of the ground to a depth of 18 inches <br />' below the subgrade. All depressions excavated below the original ground surface for or by <br />the removal of such objects, shall be refilled with suitable materials and compacted to a <br />density conforming to the surrounding ground surface. <br />' B. In areas so designated, top soil, not muck shall be stockpiled. Topsoil so stockpiled shall <br />be protected until it is placed as specified. Any topsoil remaining after all work is in place <br />' shall be disposed of by the Contractor in the manner specified in Section 02221. <br />3.04 DISPOSAL OF CLEARED AND GRUBBED MATERIAL <br />A. The Contractor shall dispose of all material and debris from the clearing and grubbing <br />operation by shipping such material and debris and disposing such material to a suitable <br />location as required by the Engineer or the governmental agencies. Disposal by deep burial <br />' will not be permitted. The cost of disposal of material (including hauling) shall be <br />considered a subsidiary obligation of the Contractor, the cost of which shall be included in <br />the contract prices. <br />1 <br />1 12/04 02100 -1 03 -4138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.