Laserfiche WebLink
welding. All picket and rail intersections shall also be joined either by welding or by the same retaining <br />rod process used for panel assembly. <br />PART 3 - EXECUTION <br />3.01 PREPARATION <br />All new installation shall be laid out by the contractor in accordance with the construction plans. <br />3.02 INSTALLATION <br />Fence posts shall be set in accordance with the spacings shown in Table 2, plus or minus 1/2 ", depending <br />on the nominal span specified. <br />Table 2 — Post Spacing Requirements <br />Span <br />8' Nominal (92" Rail) <br />Post Size <br />2-1/2" <br />Post Settings f' /z O.C. <br />95 -1/2" <br />Gate posts shall be spaced according to the gate openings specified in the construction plans. The <br />"Earthwork" and "Concrete" sections of this specification shall govern post base material requirements. <br />Aegis PIusTM panels shall be attached to posts using mechanically fastened panel brackets supplied by the <br />manufacturer. <br />3.03 CLEANING <br />The contractor shall clean the jobsite of excess materials; post -hole excavations shall be scattered <br />uniformly away from posts. <br />END OF SECTION <br />12/04 02444 -4 03 -4138 <br />