Laserfiche WebLink
Golden Shores Entrance Wall <br />UNIT PRICE BID SCHEDULE <br />Item Estimated <br />No. Description Quantity Unit Unit Price Estimated Amount <br />I. GENERAL <br />1 Furnish and Install eight -foot (8') high Pre -Cast <br />Concrete Barrier Wall including coping and <br />caps. <br />2 Furnish and Install coping on existing barrier <br />wall <br />3 Remove and dispose of chain -link fence <br />SUBTOTAL GENERAL <br />3 Mobilization and Demobilization of all <br />equipment and personnel (10% of Subtotal) <br />4 Having examined the place of the work and all <br />matters referred to in the Instructions to Bidders <br />and the Contract Documents prepared by <br />Calvin - Giordano and Associates, Inc., the <br />Engineer for the above referenced project, we, <br />the undersigned, hereby offer to enter into a <br />Contract to perform the work of the base <br />contract for the Lump Sum Price which <br />includes the entire project as shown on the <br />plans and described in the specifications. <br />GRAND TOTAL GENERAL <br />517 <br />LF <br />$ <br />920 <br />LF <br />$ <br />517 <br />LF <br />1 <br />LS <br />$ <br />1 LS $ <br />12/04 00300 -2 04 -4801 <br />