My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00800 <br />ISUPPLEMENTARY CONDITIONS <br />t The following supplements modify, change from or add to the Standard General Conditions of the <br />Construction Contract, EJCDC Document 1910 -8, 1996 Edition. Where any Article of the General <br />Conditions is modified or any Paragraph, Subparagraph or Clause thereof is modified or deleted by these <br />' supplements, the unaltered provisions shall remain in effect. <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY <br />' Add the following sentence to 1.28 Notice of Award: "When requested by OWNER, the Notice of Award <br />may be issued by the ENGINEER." <br />' Add the following sentence to 1.29 Notice to Proceed: "When requested by OWNER, the Notice to <br />Proceed may be issued by ENGINEER." <br />' Add the following terms after Paragraph 1.50: <br />1.51 ARCHITECT /ENGINEER - The person, firm or corporation named as the ENGINEER in the <br />' Agreement. <br />1.52 Provide - As used in the Project Manual, means to furnish and install, complete and ready for <br />' intended use. <br />1.53 Product - As used in the Project Manual, includes materials, fabrications, systems and equipment. <br />' 1.54 Project Manual - The volume of written construction documents, including the Bidding Documents, <br />sample forms, and the Contract Documents, such as the Conditions of the Contract and the Specifications. <br />ARTICLE 2 - PRELIMINARY MATTERS <br />Add the following to Paragraph 2.01.: "If the Work is to be commenced prior to execution of the <br />' Agreement in response to a letter of intent, CONTRACTOR shall, prior to commencement of the Work, <br />submit evidence satisfactory to OWNER that such bonds will be furnished." <br />In the first line of Paragraph 2.02., change the term "...ten..." to read "...six... ". <br />Delete Paragraph 2.03. and replace with the following: <br />' 2.03. The date of commencement of the Work is the date established in a Notice to Proceed. If there is <br />no Notice to Proceed, it shall be the date of the OWNER - CONTRACTOR Agreement or such other date <br />' as may be established therein. <br />Add the following to Paragraph 2.05.: <br />' D. CONTRACTOR shall perform no portion of the Work at any time without Contract Documents or, <br />where specified, approved Shop Drawings for such portion of the Work. <br />t <br />1 12/04 00800 -1 04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.