My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Unit Price Abbreviations: <br />1. <br />Lineal Feet - LF <br />2. <br />Acre - AC <br />3. <br />Cubic Yard - CY <br />4. <br />Square Yard - SY <br />5. <br />Each - EA <br />6. <br />Lump Sum - LS <br />7. <br />Ton - TN <br />8. <br />Net Mile - NM <br />9. <br />Gross Mile - GM <br />10. <br />Gallons - GA <br />11. <br />Million Gallons - MG <br />PART 2 - PRODUCTS (Not applicable) <br />PART 3 - EXECUTION <br />3.01 MEASUREMENT AND PAYMENT <br />A. Furnish and Install Barrier Wall <br />Measurement for payment for furnishing and installing an eight -foot (8') high <br />pre -cast concrete barrier wall will be based upon the actual number of linear feet <br />of such barrier wall constructed as directed by the ENGINEER, all in accordance <br />with the requirements of the Contract Documents. <br />2. Payment for furnishing and installing an eight -foot (8') high pre -cast concrete <br />barrier wall will be made at the unit price per linear feet named in the Bid <br />Schedule which price shall constitute full compensation for completing said <br />work, including all earthwork, construction of barrier wall, disposal of excess <br />' material, and the appurtenant items for which separate payment is not specifically <br />included in the Bid Schedule. <br />' B. Furnish and Install Coping <br />1. Measurement for payment for furnishing and installing coping on the existing <br />' barrier wall will be based upon the actual number of linear feet of such coping <br />constructed as directed by the ENGINEER, all in accordance with the <br />requirements of the Contract Documents. <br />i <br />2. Payment for furnishing and installing coping on the existing barrier wall will be <br />made at the unit price per linear feet named in the Bid Schedule which price shall <br />constitute full compensation for completing said work, including construction of <br />coping, disposal of excess material, and the appurtenant items for which separate <br />payment is not specifically included in the Bid Schedule. <br />Remove and Dispose of Existing Chain -Link Fence <br />1 12/04 01025 -2 04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.