My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2010-1605
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2010
>
Reso 2010-1605
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2016 4:53:50 PM
Creation date
1/13/2011 2:04:28 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2010-1605
Date (mm/dd/yyyy)
09/16/2010
Description
RFP 10-07-02, Agmt w/Shoreline Foundation Demo/Construct Fishing Pier
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />basis in accordance with the Contract Documents. Time is of the essence of this Agreement. <br />All Work shall be performed strictly (not substantially) within the time limitations necessary to <br />meet all deadlines established in the Construction Schedule and the Contract Documents. <br /> <br />2.7 All dates and periods of time set forth in the Construction Schedule and the Contract <br />Documents, including those for the commencement, prosecution, Interim milestones, <br />milestones, and completion of the Work, and for the delivery and installation of materials and <br />equipment, were included because of their importance to the City. <br /> <br />2.8 Contractor acknowledges and recognizes that (i) the City is entitled to full and beneficial <br />occupancy and use of the completed Work following expiration of the Time for Completion, <br />and (ii) the City will schedule the opening of the Project based upon the Contractor's achieving <br />Substantial Completion of the Work on or before the Time for Completion. <br /> <br />2.9 Contractor agrees to the assessment of liquidated damages as provided in this Agreement. <br /> <br />2.10 Except for extensions approved in writing by the City, Excusable Delays, or as <br />otherwise specifically provided in this Agreement, the Contractor understands that the occurrence <br />of events of delay within the Contractor's control, shall not excuse the Contractor from its <br />obligation to achieve Substantial completion of the Work within the time stipulated in this <br />Agreement, and shall not entitle the Contractor to an adjustment of the Contract Amount. All <br />parties under the control or contract with the Contractor shall include, but are not limited to, <br />subcontractors, materialmen and/or laborers. <br /> <br />ARTICLE 3. EXCUSABLE DELAY <br /> <br />The Time for Completion may be extended by reason of an Excusable Delay. An Excusable <br />Delay is delay caused by circumstances (i) beyond the control of Contractor, its Sub- <br />Contractors, suppliers and vendors and (ii) not caused by the negligence of Contractor, its Sub- <br />Contractors, suppliers and vendors. Where Contractor claims that it is entitled to an extension <br />because of an excusable delay, it shall furnish to the Project Manager all documentation <br />supporting its claim, including, details of the claim, a description of the work affected and the <br />actual costs resulting from the delay. Failure of Contractor to comply with this Article as to any <br />particular event of delay shall be deemed conclusively to constitute a waiver, abandonment or <br />relinquishment of any and all claims resulting from that particular event of delay. <br /> <br />ARTICLE 4. NO DAMAGE FOR DEL A Y <br /> <br />In the event construction of the Project is delayed through no fault of Contractor or Owner, it is <br />agreed that Contractor's sole and exclusive remedy is a time extension of the Time for <br />Completion equal to each day the Work is so delayed. The City shall not be liable for any delay <br />damages or damages in any way attributable to performing work out of sequence, acceleration <br />claims, or other similar type claims, incurred by Contractor or any of its Sub-contractors, arising <br />out of or in any way associated with the performance of this Contract. In the event Contractor is <br />delayed in performance of the Work by act or omission of Owner, or Owner's Agents, <br /> <br />HISTORIC SUNNY ISLES BEACH/NEWPORT FISHING PIER AT PIER PARK <br /> <br />" <br /> <br />~ <br />~') <br /> <br />I... <br />
The URL can be used to link to this page
Your browser does not support the video tag.