My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2010-1605
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2010
>
Reso 2010-1605
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2016 4:53:50 PM
Creation date
1/13/2011 2:04:28 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2010-1605
Date (mm/dd/yyyy)
09/16/2010
Description
RFP 10-07-02, Agmt w/Shoreline Foundation Demo/Construct Fishing Pier
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />and all conditions of the permits and regulatory agencies have been met, a Final Certificate for <br />Payment shall be issued by the City or its designee, stating that the requirements of the <br />Contract Documents have been performed and the Work is ready for acceptance under the <br />terms and conditions thereof. <br /> <br />5.6 Before issuance of the Final Certificate for Payment, Contractor shall deliver to the <br />City or its designee a complete release of all liens arising out of this Agreement, or receipts in <br />full in lieu thereof, an affidavit certifying that all suppliers and Sub-Contractors have been paid <br />in full and that all other indebtedness cOIlllected with the Construction Work has been paid, and a <br />consent of the surety to final payment; the final corrected As-Built Drawings; the Record <br />Set; and the final bill of materials, if required, and Application for Payment. Contractor <br />shall deliver the written Contractor's and all Manufacturers warranties prior to issuance of <br />the Final Certificate for Payment. <br /> <br />5.7 If, after the Construction Work has been substantially completed, full completion <br />thereof is materially delayed through no fault of Contractor, and the City or its designee so <br />certifies, the City shall, upon certificate of its designee, and without terminating the <br />Agreement, make payment of the balance due for that portion of the Construction Work fully <br />completed and accepted. Such payment shall be made under the terms and conditions <br />governing final payment, except that it shall not constitute a waiver of claims. <br /> <br />5.8 Final payment shall be made only after the City or designee has reviewed a written <br />evaluation of the performance of Contractor prepared by the City or its designee, and approved <br />the final payment. The acceptance of final payment shall constitute a waiver of all claims by <br />Contractor, except those previously made in strict accordance with the provisions of the <br />Agreement and identified by Contractor as unsettled at the time of the application for final <br />payment. <br /> <br />ARTICLE 6. REQUESTS FOR INFORMATION (RFI) <br /> <br />The Contractor shall submit in writing a Request for Information (RFI) to the City or its <br />designee, where the Contractor believes that the specifications or drawings are unclear or <br />conflict. All requests must be submitted in a manner that clearly identifies the drawing <br />and/or specification section where clarification or interpretation is being requested. <br /> <br />ARTICLE 7. FIELD DIRECTIVES <br /> <br />The City or its designee may at times issue Field Directives to the Contractor based on visits <br />to the Project site. Such Field Directives shall be issued in writing and the Contractor shall be <br />required to comply with such directive. Where the Contractor believes that the directive is <br />outside the scope of the Work, the Contractor shall, within 48 hours, notify the City or its <br />designee that the Field Directive is outside the scope of the Work. At that time the Field <br />Directive may be rescinded or the Contractor may be required to submit a request for a Change <br /> <br />HISTORIC SUNNY ISLES BEACHlNEWPORT FISHING PIER AT PIER PARK <br /> <br />.... <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.