Laserfiche WebLink
request for a Change Order, the Contract Amount, the Contract Time, or Time for Completion. <br />The Work shall not be delayed or postponed pending resolution of any disputes or <br />disagreements. All disputes shall be resolved in accordance with Article 37 pertaining to <br />Mediation and Arbitration of Disputes. <br /> <br />ARTICLE 20. AUTHORITY OF THE CITY AND ITS DESIGNEE <br /> <br />20.1 The City or its designee shall determine or answer, all questions of any nature whatsoever <br />arising out of, under or in connection with, or in any way relating to or on account of the Work, <br />and/or as to the interpretation of the Work to be performed. <br /> <br />20.2 The Contractor shall be bound by all determinations or orders of the City or its <br />Designee and shall promptly respond to requests of the City or its Designee, including the <br />withdrawal or modification of any previous order, and regardless of whether the Contractor <br />agrees with the City's or its designee's determination or requests. <br /> <br />20.3 The City's designee shall have authority to act on behalf of the City to the extent <br />provided by the Agreement, unless otherwise modified in writing by the City. All instructions to <br />the Contractor shall be issued in writing. All instructions to the Contractor shall be issued <br />through the City or its designee, <br /> <br />20.4 The City or its designee shall have access to the Project Site during normal work <br />hours, unless access is required by the City due to health, safety or welfare of the City or the <br />public. The Contractor shall provide safe facilities for such access so the City or it designee may <br />perform their functions under the Agreement. The City or its designee will make periodic visits to <br />the Work Site to become generally familiar with the progress and quality of the Work, and to <br />determine if the Work is proceeding in accordance with the Contract Documents. <br /> <br />20.5 The City or its designee will not be responsible for construction means, methods, <br />techniques, sequences or procedures, or for safety precautions and programs in connection <br />with the Work, and will not be responsible for the Contractor's failure to carry out the <br />Construction Work in accordance with the Agreement. <br /> <br />20.6 The City or its designee will have authority to reject Work that does not conform to <br />the Contract Documents requirements. Whenever, in his or her opinion, it is considered <br />necessary or advisable to ensure the proper implementation of the Contract Documents, the <br />City or its designee will have authority to require special inspections or testing of the <br />Construction Work, whether or not such Construction Work is fabricated, installed or completed. <br />Neither the City's and/or its designee's authority to act under this Article, nor any decision <br />made by himlher in good faith either to exercise or not to exercise such authority, shall give rise <br />to any duty or responsibility of the City or its designee to the Contractor, any Sub-Contractor, <br />supplier or any of their agents, employees, or any other person performing any of the Construction <br />Work. Should the City decide in its opinion that special inspections or testing is required, the <br />cost of such additional inspection or testing shall be borne by the City if the inspected or tested <br />work is in substantial conformity with the plans and specifications. <br /> <br />HISTORIC SUNNY ISLES BEACHlNEWPORT FISHING PIER AT PIER PARK <br /> <br />" <br /> <br />1 <br />