My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2010-1605
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2010
>
Reso 2010-1605
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2016 4:53:50 PM
Creation date
1/13/2011 2:04:28 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2010-1605
Date (mm/dd/yyyy)
09/16/2010
Description
RFP 10-07-02, Agmt w/Shoreline Foundation Demo/Construct Fishing Pier
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />the City of Sunny Isles Beach, Miami-Dade County, State of Florida, and Florida Building <br />Code) which bear on the performance of the Work. <br /> <br />25.3 If an emergency condition should develop during the Project, the Contractor must <br />immediately notify the City or its designee of each and every occurrence. The Contractor <br />should also recommend any appropriate course(s) of action to the City or its designee. <br /> <br />ARTICLE 26. PRIORITY OF PROVISIONS <br /> <br />26.1 If there is a conflict or inconsistency between any term, statement requirement, or <br />provision of any Exhibit or Attachment hereto, any document or events referred to herein, or any <br />document incorporated into this Agreement by reference and a term, statement, requirement, the <br />specifications and plans, or provision of this Agreement the following order of precedence shall <br />apply: <br /> <br />26.2 In the event of conflicts in the Contract Documents the priorities stated below shall <br />govern. <br /> <br />· Revisions to the Contract Documents shall govern over the Contract <br />Documents <br /> <br />· Supplemental Provisions shall govern over general terms and conditions <br />· No section of the Scope of Work, specifications or plans shall govern over the <br />Contract Terms and Conditions <br />· Scope of Work and Specifications shall govern over plans and drawings <br /> <br />26.3 In the event of conflicts with the plans the priorities stated below shall govern: <br /> <br />· Schedules, when identified as such shall govern over all other portions of the <br />plans <br />· Specific notes shall govern over all other notes, and all other portions of <br />the plans, unless specifically stated otherwise <br />· Larger scale drawings shall govern over smaller scale drawings <br />· Figured or numerical dimensions shall govern over dimensions obtained <br />by scaling <br />· Where provisions of codes, manufacturer's specifications or industry <br />standards are in conflict, the more restrictive or higher quality shall govern <br /> <br />26.4 In the event omissions in the Contract Documents are not complete as to any <br />incidental detail of construction or construction system or with regard to the manner of <br />combining or installing equipment, parts, or materials, such detail shall be deemed to be an <br />implied requirement of the Contract Documents. "Minor Detail" shall include the concept of <br />substantially identical components, where the price of each such component is small. The <br />quality and quantity of the equipment, material, or part so furnished shall conform to trade <br />standards and be compatible with the type, composition, strength, size and profile of the <br />equipment, materials or parts otherwise specified in the Contract Documents. <br /> <br />,.. <br /> <br />') <br />I <br /> <br />HISTORIC SUNNY ISLES BEACHlNEWPORT FISHING PIER AT PIER PARK <br />
The URL can be used to link to this page
Your browser does not support the video tag.