My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2010-1605
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2010
>
Reso 2010-1605
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2016 4:53:50 PM
Creation date
1/13/2011 2:04:28 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2010-1605
Date (mm/dd/yyyy)
09/16/2010
Description
RFP 10-07-02, Agmt w/Shoreline Foundation Demo/Construct Fishing Pier
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />discretion, elect either to: (1) deduct an amount equal to that to which the City is entitled from <br />any payment then or thereafter due the Contractor from the City, or (2) issue a written notice to <br />the Contractor reducing the Contract Amount by an amount equal to that to which the City is <br />entitled. <br /> <br />7.7 Final Completion and Final Payment <br /> <br />7.7.1 The final approval for payment will not be issued by the City's Representative until all <br />warranties and guarantees have been received and accepted by the City. <br /> <br />7.7.2 The City will request the Contractor to submit the application for final payment along with <br />a manually signed notarized letter on the Contractor's letterhead certifying that: <br /> <br />.1 Labor costs, prevailing wage rates, fringe benefits and material costs have been paid. <br /> <br />.2 Subcontractors of any tier and manufacturers furnishing materials and labor for the project <br />have fully completed their Work and have been paid in full. <br /> <br />.3 The project has been fully completed in accordance with the Contract Documents as modified <br />by Change Orders. <br /> <br />.4 The acceptance by Contractor of its final Payment, by check or electronic transfer, shall be <br />and operate as a release of all claims of Contractor against City for all things done or furnished <br />or relating to the Work and for every act or alleged neglect of City arising out of the Work. <br /> <br />.5 final payment to Contractor shall be made within thirty (30) days of all of the requirements <br />listed in 7.7.2.1 through.4 being met by Contractor and all work being completed and accepted <br />by the City. <br /> <br />7.7.3 No payment under this Contract, including but not limited to fmal payment, shall constitute <br />acceptance by City of any Work or act not in accordance with the requirements of the Contract <br />Documents. <br /> <br />PROVISION 8 <br />BONDS <br /> <br />8.1 Bonds: Bid Bonds, when required, shall be submitted with the Bid in the amount <br />specified in the Contract Documents. After acceptance of Bid, the City will notify the successful <br />bidder to submit a performance bond and certificate of insurance in the amount specified herein. <br /> <br />8.1.1 The Contractor shall procure and furnish a Performance Bond and a Payment Bond in the <br />form prepared by the City, each in an amount equal to one hundred percent (100%) of the <br />Contract Amount, as well as adjustments to the Contract Amount. The Performance Bond shall <br />secure and guarantee Contractor's faithful performance of this Contract, including but not <br />limited to Contractor's obligation to correct defects after fmal payment has been made as <br /> <br />,... <br /> <br />., <br /> <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.