My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2010-1605
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2010
>
Reso 2010-1605
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2016 4:53:50 PM
Creation date
1/13/2011 2:04:28 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2010-1605
Date (mm/dd/yyyy)
09/16/2010
Description
RFP 10-07-02, Agmt w/Shoreline Foundation Demo/Construct Fishing Pier
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PRIOR EXPERIENCE <br />Consultores Occidentales, S.A. (COSA) - Maracaibo, Venezuela 2001 to 2003 <br />. Senior Project Manager <br />Reported to the Vice President of Construction and Project Leaders of Petroleos de Venezuela, S.A. (PDVSA). <br />Supervised twenty-eight (28) employees including craft, technical, and professional. Responsibilities included direct <br />management, supervision, and administration of several projects from inception to start-up including a new Oil Recovery <br />Process, and equipment manufacturing, <br />· Conceived, designed and developed a new system for prevention of cooling water spillage for Tube type Compressed <br />Gas Heat Exchangers, Reduced plant shut down time resulting in an annual savings of$IM. <br />· Instituted procedures that allowed replacement of up to 18 gas heat exchangers in a time period of 10 hours. This <br />made it possible to replace 200 heat exchangers in less than three months, with minimum plant shut down, no impact <br />upon gas production, and no impact upon oil production, for an annual savings of $12M. <br />· These achievements secured a commendation from PDVSA Project Leaders, as well as from COSA. <br /> <br />Montaje Electromecanieo, C.A. (MECA) - Maracaibo, Vzla 1982 to 2000 <br />. Senior Vice President <br />Reported to the Board of Directors and supervised thirty-five (35) employees (craft, technical, and professional), as well <br />as several contractors. Responsibilities included direct management, supervision, and administration of construction <br />projects from ground breaking to completion, <br />· During this period completed 53 industrial service installations, and 4 residential housing and high rise developments <br />totaling $50 Million, <br /> <br />Free Lance Engineering 1980 to 1998 <br />. Design Engineer <br />Designed, budgeted, and supervised the construction of Electric Power Distribution Systems for commercial, industrial, <br />and residential purposes. <br /> <br />EDUCATION <br /> <br />Bachelor of Science Degree in Electric Power Engineering <br />Rensselaer Polytechnic Institute, Troy, NY <br /> <br />LICENSES <br /> <br />Florida Licensed Professional Engineer. Lie # 62583 <br />
The URL can be used to link to this page
Your browser does not support the video tag.