My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Luke's Landsc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 01-09-01 Parks/Median/Rights-of-Way Maint.
>
Luke's Landsc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 4:05:37 PM
Creation date
1/13/2011 3:59:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Parks/Medians/Rights-of-Way Maint.
Bid No. (xx-xx-xx)
01-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[I <br />C� <br />n <br />CITY OF SUNNY ISLES BEACH <br />PARKS/MEDIANS/RIGHT -OF- WAY MAINTENANCE <br />FORM OF PAYMENT BOND <br />KNOW ALL MEN BY THESE PRESENTS: <br />That, pursuant to the requirements of Florida Statute 255.05, we, <br />as Principal, hereinafter called CONTRACTOR, and , as Surety, <br />are bound to the City of Sunny Isles Beach, Florida, as Obligee, hereinafter called OWNER, in the <br />amount of Dollars ($ ) for the payment whereof CONTRACTOR <br />and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly <br />and severally. <br />WHEREAS, CONTRACTOR has by written agreement entered into a Contract, Bid/Contract <br />No.: , awarded the day of , 19 , with OWNER for <br />in accordance with drawings (plans) and specifications prepared by _ <br />which Contract is by reference made a part hereof, and <br />is hereafter referred to as the Contract; <br />THE CONDITION OF THIS BOND is that if the CONTRACTOR: <br />Indemnifies and pays OWNER all losses, damages (specifically including, but not limited <br />to, damages for delay and other consequential damages caused by or arising out of the acts, <br />omissions or negligence of CONTRACTOR), expenses, costs and attorney's fees including <br />attorney's fees incurred in appellate proceedings, that Owner sustains because of default by <br />CONTRACTOR under the Contract; and <br />2. Promptly makes payments to all claimants as defined by Florida Statute 225.05(1) supplying <br />CONTRACTOR with all labor, materials and supplies used directly or indirectly by <br />CONTRACTOR in the execution of the Work provided for in the Contract, then his <br />obligation shall be void; otherwise, it shall remain in full force and effect subject, however, <br />to the following conditions: <br />2.1 A claimant, except a laborer, who is not in privity with the CONTRACTOR and who <br />has not received payment for his labor, materials, or supplies shall, within forty -five <br />(45) days after beginning to furnish labor, materials, or supplies for the prosecution <br />of the work, furnish to the CONTRACTOR a notice that he intends to look to the <br />Bond for protection. <br />11'W'JDDG7Cfl%DTI <br />COMPANY NAME: <br />
The URL can be used to link to this page
Your browser does not support the video tag.