My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Luke's Landsc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 01-09-01 Parks/Median/Rights-of-Way Maint.
>
Luke's Landsc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 4:05:37 PM
Creation date
1/13/2011 3:59:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Parks/Medians/Rights-of-Way Maint.
Bid No. (xx-xx-xx)
01-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH <br />PARKS /MEDIANS/RIGHT -OF -WAY MAINTENANCE <br />FORM OF PERFORMANCE BOND <br />KNOW ALL MEN BY THESE PRESENTS: <br />That, pursuant to the requirements of Florida Statute 255.05, we, <br />, as Principal, hereinafter called CONTRACTOR, and , as Surety, <br />are bound to the City of Sunny Isles Beach, Florida, as Obligee, hereinafter called OWNER, in the <br />amount of Dollars ($ ) for the payment whereof CONTRACTOR <br />and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly <br />and severally. <br />WHEREAS, CONTRACTOR has by written agreement entered into a Contract, Bid/Contract <br />No.: , awarded the day of , 19 , with OWNER for <br />in accordance with drawings (plans) and specifications prepared by _ <br />which Contract is by reference made a part hereof, and <br />is hereafter referred to as the Contract; <br />THE CONDITION OF THIS BOND is that if the CONTRACTOR: <br />Fully performs the Contract between the CONTRACTOR and the OWNER for construction <br />of , within calendar days after the date of <br />contract commencement as specified in the Notice to Proceed and in the manner prescribed <br />in the Contract; and <br />2. Indemnifies and pays OWNER all losses, damages (specifically including, but not limited <br />to, damages for delay and other consequential damages caused by or arising out of the acts, <br />omissions or negligence of CONTRACTOR), expenses, costs and attorney's fees including <br />attorney's fees incurred in appellate proceedings, that Owner sustains because of default by <br />CONTRACTOR under the Contract; and <br />3. Upon notification by the Owner, corrects any and all defective or faulty work or materials <br />which appear within one (1) year, and: <br />4. Performs the guarantee of all work and materials furnished under the Contract for the time <br />specified in the Contract, then this Bond is void, otherwise it remains in full force. <br />BIDDERS NAME: <br />COMPANY NAME: <br />
The URL can be used to link to this page
Your browser does not support the video tag.