|
3. Payments made by CONTRACTOR to
<br />Subc onutictors for Work performed by Subcontractors.
<br />If required by OWNER, CONTRACTOR shall obtain
<br />competitive bids from subcontractors acceptable to
<br />OWNER and CONTRACTOR and shall deliver such
<br />bids to OWNER, who will then determine, with the
<br />advice of ENGINEER, which bids, if any, will be
<br />acceptable. If any subcontract provides that the
<br />Subcontractor is to be paid on the basis of Cost of the
<br />Work plus a fee, the Subcontractor's Cost of the Work
<br />and fee shall be determined in the same manner as
<br />CONTRACTOR's Cost of the Work and fee as provided
<br />in this paragraph 11.01.
<br />4. Costs of special consultants (including but not
<br />limited to engineers, architects, testing laboratories,
<br />surveyors, attorneys, and accountants) employed for
<br />services specifically related to the Work.
<br />5. Supplemental costs including the following
<br />a. The proportion of necessary transportation,
<br />travel, and subsistence expenses of
<br />CONTRACTOR's employees incurred in discharge
<br />of duties connected with the Work.
<br />b. Cost, including transportation and mainte-
<br />nance, of all materials, supplies, equipment,
<br />machinery, appliances, office, and temporary facili-
<br />ties at the Site, and hand tools not owned by the
<br />workers. which are consumed in the performance of
<br />the Work, and cost, less market value, of such items
<br />used but not consumed which remain the property of
<br />CONTRACTOR.
<br />c. Rentals of all eonstrtiction equipment and
<br />machinery. Sad the part: thereof whether rented
<br />from CONTRAC MR or otbets in accordance with
<br />rental agreements approved by OWNER with the
<br />advice of ENGINEER, and the costs of
<br />transportation, loading, unloading, assembly,
<br />dismantling. and removal thereof. All such costs
<br />shall be in accordance with the terms of said rental
<br />agreements. The rental of any such equipment, ma-
<br />chinery, or parts shall cease when the use thereof is
<br />no longer necessary for the Work.
<br />d. Sales, consumer, use, and other similar
<br />taxes related to the Work. and for which CON-
<br />TRACTOR is liable, imposed by haws and Regu-
<br />lations. =
<br />e. Deposits lost for causes other than negli-
<br />gence of CONTRACTOR, airy Subcontractor, or
<br />anyone &=4 or indirectly employed by nay of
<br />them or for whose acts any of them may be liable,
<br />and royalty payments and fees for permits and
<br />licenses.
<br />f. Losses and damages (and related expenses) .
<br />caused by damage to the Work, not compensated by
<br />insurance or otherwise, sustained by
<br />CONTRACTOR in connection with the perfor-
<br />mance of the Work (except losses and damages
<br />within the deductible amounts of property insurance
<br />established in accordance with paragraph 5.06.13),
<br />provided such losses and damages have resulted
<br />from causes other than the negligence of
<br />CONTRACTOR, any Subcontractor, or anyone
<br />directly or indirectly employed by any of them or
<br />for whose acts any of them may be liable. Such
<br />losses shall include . settlements made with the
<br />written consent and approval of OWNER. No such
<br />losses, damages. and expenses shall be. included in
<br />the Cost of the Work for the purpose of determining
<br />CONTRACTOR's fee.
<br />g. The cost of utilities, fuel, and sanitary
<br />facilities at the Site.
<br />h. Minor expenses such as telegrams, long
<br />distance telephone calls, telephone service at the
<br />Site, expressage, and similar petty cash items in
<br />connection with the Work.
<br />i. When the Cost of the Work is used to
<br />determine the value of a Change Order or of a
<br />Claim, the cost of premiums for additional Bonds
<br />and insurance required because of the changes in the
<br />Work or caused by the event giving rise to the
<br />Claim.
<br />j.. When all the Work is performed as the
<br />basis of -cost -plus, the. costs of ptemiutns for all
<br />Bonds and insivance CONTRACTOR is sequined by
<br />the. Contract • Documents to purchase and maintain.
<br />B. Costs Excluded: The term Cost oT the Work shall
<br />not include any of the following items;
<br />00700-31
<br />1. Payroll costs and other compensation of
<br />CONTRACTOR's officers, executives, principals (of
<br />partnerships sad sole ProPrictorshiPs), general manag-
<br />ers, engineers, architects, estimators, attorneys, audi-
<br />tOfs, Sccotmtaats. Purchasing and contracting agents.
<br />expediters, dmcbq s, clerb, and other personnel
<br />eatpbyed by CONTRAC M& wbedwr at the Site at in
<br />CQNTRACTOR's principal or breach office for generitl
<br />administration of the Work and not specifically included
<br />in the agreed upon schedule of job classifications
<br />referred to is paragraph 11.01.A.1 or specifically
<br />covered by paragraph 11.01. k.4, all of which are to be
<br />
|