My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Siltek #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-04-01) 181st Drive Active Park
>
Responses
>
Siltek #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2022 11:59:30 AM
Creation date
1/14/2011 11:25:43 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
181st Drive Active Park
Bid No. (xx-xx-xx)
05-04-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
revise or revoke any such payment recommendation <br />previously trade, to such extent as may be necessary in <br />ENGINEER's opinion to protect OWNER from loss <br />because: <br />a. the Work is defective, or completed Work <br />has been damaged, requiring correction or replace- <br />ment; <br />b. the Contract Price has been reduced by <br />Written Amendment or Change Orders; <br />c. OWNER has been required to correct <br />defective Work or complete Work in accordance <br />with paragraph 13.09; or <br />d. ENGINEER has actual knowledge of •the <br />occurrence of any of the events enumerated in para- <br />graph 15.02.A. <br />OWNER shall promptly pay CONTRACTOR the <br />amount so withheld, or any adjustment thereto agreed to <br />by OWNER and CONTRACTOR, when CONTRAC- <br />TOR corrects to OWNER's satisfaction the reasons for <br />such action. <br />3. If it is subsequently determined that OWNER's <br />refusal of payment was not justified, the amount <br />wrongfully withheld shall be treated as an amount due as <br />determined by paragraph 14.02.C.1. <br />14.03 CONTRACTOR's Warranty of 7711e <br />A. CONTRACTOR warrants and guarantees that title <br />to all Work, materials, and equipment covered by any <br />Application for Payment, whether incorporated in the Project <br />or not, will pass to OWNER. no later than the time of <br />payment free and-clear of all Liens. <br />14.04 Substantial Completion <br />C. Payment Becomes Due <br />A. When CONTRACTOR considers the entire Work <br />1. Ten days after presentation of the Application ready for its intended use CONTRACTOR shall notify <br />for Payment to OWNER with ENGINEER's recom- OWNER and ENGINEER in writing that the entire Work is <br />mendation, the amount recommended will (subject to the substantially complete (except for items specifically listed by <br />provisions of paragraph 14.02.D) become due, and when CONTRACTOR as incomplete) and request that ENGINEER <br />due will be paid by OWNER to CONTRACTOR. issue a certificate of Substantial Completion. Promptly <br />thereafter, OWNER, CONTRACTOR, and ENGINEER <br />D. Reduction in Payment shall make an inspection of the Work to determine the status <br />of completion. If ENGINEER does not consider the Work <br />1..OWNER may refuse to make payment of the substantially complete, ENGINEER will notify <br />full amount recommended by ENGINEER because: CONTRACTOR in writing giving the reasons therefor. If <br />ENGINEER considers the Work substantially complete, <br />a. claims have been made against OWNER on ENGINEER will prepare and deliver to OWNER a tentative <br />account of CONTRACTOR's performance or fur- certificate of Substantial Completion which shall fix the date <br />nishing of the Work; of Substantial Completion. There shall be attached to the <br />certificate . a tentative .list . of items to be completed or <br />b. Liens have been filed in connection with�the.-. r corrected beforefinal - payments OWNER shall have seven <br />Work, except where CONTRACTOR has delivered days -after receipt of. die tentative certificate during which to <br />a specific Bond satisfactory to OWNER to secure make written objection to ENGINEER as to any provisions <br />the satisfaction and discharge of such Liens; of the certificate or attached list. If, after considering such <br />objections, ENGINEER concludes that the Work is not <br />c. there are other items entitling OWNER to substantially complete, ENGINEER will within 14 days after <br />a set -off against the amount recommended; or submission of the tentative certificate to OWNER notify <br />CONTRACTOR in writing, stating the reasons therefor. If, <br />d. OWNER has actual knowledge of the occur- after consideration of OWNER's objections, .ENGINEER <br />rence of any of the events enumerated in paragraphs considers the Work substantially complete, ENGINEER will <br />14.02.B.5.a through 14.02.B.5.c or paragraph within said 14 days execute and deliver to OWNER and <br />15.02.A. CONTRACTOR a definitive certificate of Substantial <br />Completion (with a revised tentative list of items to be <br />2. If OWNER refuses to make payment of the full <br />amount recommended by ENGINEER, OWNER must <br />give CONTRACTOR immediate written notice (with a <br />copy to ENGINEER) stating the reasons for such action <br />and promptly pay CONTRACTOR any amount <br />remaining aftt. deduction of the amount so withheld. <br />completed or corrected) reflecting such changes from <br />tentative certificate as ENGINEER believes justified after <br />consideration of any objections from OWNER. At the time <br />of delivery of the tentative certificate of Substantial Comple- <br />tion ENGINEER will deliver to OWNER and CONTRAC- <br />TOR a written recommendation as to division of rapomb"i- <br />00700 -38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.