My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Siltek #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-04-01) 181st Drive Active Park
>
Responses
>
Siltek #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2022 11:59:30 AM
Creation date
1/14/2011 11:25:43 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
181st Drive Active Park
Bid No. (xx-xx-xx)
05-04-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
use of any such term or adjective shall not be effective to <br />assign to ENGINEER any duty or authority to supervise <br />or direct the performance of the Work or any duty or <br />authority to undertake responsibility contrary to the <br />provisions of paragraph 9.10 or any other provision of the <br />Contract Documents. <br />B. Day <br />1. The word "day" shall constitute a calendar day <br />of 24 hours measured from midnight to the next midnight. <br />C. Defective <br />1. The word "defective," when modifying the word <br />"Work," refers to Work that is unsatisfactory, faulty, or <br />deficient in that it does not conform to the Contract <br />Documents or does not meet the requirements of any <br />inspection, reference standard, test, or approval referred <br />to in the Contract Documents, or has been damaged prior <br />to ENGINEER's recommendation of final payment <br />(unless responsibility for the protection thereof has been <br />assumed by OWNER at Substantial Completion in accor- <br />dance with paragraph 14.04 or 14.05). <br />D. Furnish, Install, Perform, Provide <br />1. The word "furnish," when used in connection <br />with services, materials, or equipment, shall mean to <br />supply and deliver said services, materials, or equipment <br />to the Site (or some other specified location) ready for use <br />or installation and in usable or operable condition. <br />2. The word "install," when used in connection <br />with services, materials, or equipment, shall mean to put <br />into use or place in final position said services, materials, <br />or equipment complete and ready for intended use. <br />3. The words "perform" or "provide," when used <br />in connection with services, materials, or equipment, <br />shall mean to furnish and install said services, materials, <br />or equipment complete and ready for intended use. <br />4. When "furnish," "install," "perform," or "pro- <br />vide" is not used in connection with services, materials, <br />or equipment in a context clearly requiring an obligation <br />of CONTRACTOR, 'provide" is implied. <br />E. Unless stated otherwise in the Contract Documents, <br />words or phrases which have a well4mown technical or <br />eonsauction industry or trade meaning are used in the <br />Contract Documents in accordance with such r+ewpized <br />meaning. <br />ARTICLE 2 - PRELIMINARY MATTERS <br />2.01 Delivery of Bonds <br />A. When CONTRACTOR delivers the executed <br />Agreements to OWNER. CONTRACTOR shall also deliver <br />to OWNER such Bonds as CONTRACTOR may be required <br />to furnish. <br />2.02 Copies of Documents <br />A. OWNER shall furnish to CONTRACTOR up to ten <br />copies of the Contract Documents. Additional copies will be <br />finrnished upon request at the cost of reproduction. <br />2.03 Commencement of Contract ?imes, Notice to Proceed <br />A. The Contract Times will commence to run on the <br />thirtieth day after the Effective Date of the Agreement or. if <br />a Notice to Proceed is given, on the day indicated in the <br />Notice to Proceed. A Notice to Proceed may be given at any <br />time within 30 days after the Effective Date of the <br />Agreement. In no event will the Contract Times commence <br />to run later than the sixtieth day after the day of Bid opening <br />or the thirtieth day after the Effective Date of the Agreement, <br />whichever date is earlier. <br />2.04 Starting the Work <br />A. CONTRACTOR shall start to perform the Work on <br />the date when the Contract Times commence to run. No <br />Work shall be done at cite Site prior to the date on which the <br />Contract Titaes commence to run. <br />2.0 Before Starting Construction <br />A. CONRACTOR's Review of C Urrau Documents: <br />l3 ibm undertaking each part of the Work, CONTRACTOR <br />shall carefully. study and -compare the Contract Documents <br />and check and verify pertinent figures therein and all <br />applicable field measurements. • CONTRACTOR shall <br />promptly report m writing to ENGU4M any conflict, error. <br />ambiguity, or discrepancy which CONTRACTOR may <br />discover mad shall obtain a written interpretation � or <br />clarification from ENGINEER before proceeding with any <br />Work affected thereby; however, CONTRACTOR shall not <br />be liable to OWNER or ENGINEER for failure to report any <br />conflict, error, ambiguity, or in the Contract <br />Documents stales: CONTRACTOR knew or reasonably <br />should have known thereof. <br />r <br />B. PreU minary Scheduks: Within ten days after the <br />Effective Date of the Agreement (unless otherwise specified <br />
The URL can be used to link to this page
Your browser does not support the video tag.