My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-04-01) 181st Drive Active Park
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 3:27:35 AM
Creation date
1/14/2011 11:46:46 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
181st Drive Active Park
Bid No. (xx-xx-xx)
05-04-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
181 ST ACTIVE PARK <br />DESCRIPTION SHEET NO. <br />NOTE: REFER TO INDEX OF DRAWINGS INX -1 <br />APRILI0, 2005 <br />9.5.2. The CONTRACTOR agrees to indemnify and save harmless the CITY OF SUNNY <br />ISLES BEACH, AND MILLER LEGG and their agents and employees, from or on account of any <br />injuries or damages received or sustained by any person or person during or on account of any <br />operations connected with the construction of these roadway improvements; or by or in <br />consequence of any negligence in connection with the same; or by use of any improper materials or <br />by or on account of any act or omission of the said Contractor, subcontractor, agents, servants, or <br />employees; and <br />9.5.3. The CONTRACTOR agrees to maintain in force at all times during the life of the <br />construction, public liability insurance, by separate certificate, in an amount not less than $1,000,000 <br />for injuries, including willful death, to any one person and subject to those same limits for each <br />person, in an amount not less that $1,000,000 for damages as a result of each occurrence and <br />property damage insurance and in an amount not less than $1,000,000 for damages on any one <br />occurrence. Such policy shall specifically protect the CITY OF SUNNY ISLES BEACH, AND <br />MILLER LEGG their agents and employees, by making them an additional insured, and shall not <br />be modified or canceled without thirty (30) days written notice to the CITY OF SUNNY ISLES <br />BEACH. <br />9.5.4 Should the final completion and acceptance of the work herein embraced together with <br />any modification or additions be delayed beyond the time herein set because of lace of performance <br />by the Contract, it is understood and agreed that aside from any other liquidated damage per day for <br />such delay from such time until the work is completed and accepted as herein provided, all costs of <br />engineering and inspection on behalf of the Owner will be charged to the contractor and deducted <br />from any estimate or payment otherwise due and payable to him from time to time. The costs of <br />engineering and inspection which may be charged to the Contractor by the Owner under this article <br />shall be equal to the Engineer's charges to the Owner. <br />IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in Five (5) parts. <br />One counterpart each has been delivered to OWNER, CONTRACTOR and ENGINEER. All portions of <br />the Contract Documents have been signed, initialed or identified by OWNER and CONTRACTOR or <br />identified by ENGINEER on their behalf. <br />This Agreement will be effective on 20_ (which is the Effective Date of the Agreement). <br />ATTEST: <br />[CORPORATE SEAL] <br />Address for giving notices <br />By <br />[CORPORATE SEAL] <br />License No. <br />Agent for service of process <br />EJCDC STANDARD FORM OF AGREEMENT 00500 -6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.