My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-04-02) Landscape Improv. for Atlantic Isle
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:17:57 AM
Creation date
1/18/2011 3:37:57 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Improv.
Bid No. (xx-xx-xx)
05-04-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14.6.1 The Work is defective, or completed Work has been damaged requiring correction or replacement, <br />14.6.2 The Work for which payment is requested cannot be verified, <br />14.6.3 Claims or Liens have been filed or there is reasonable evidence indicating the probable filing thereof, <br />14.6.4 The Contract Price has been reduced because of modifications, <br />14.6.5 The CITY has been required to correct defective Work or complete the Work in accordance with <br />Article 13. <br />14.6.6 Of unsatisfactory prosecution of the Work, including failure to clean up as required by paragraphs 6.29 <br />and 6.30, <br />14.6.7 Of persistent failure to cooperate with other contractors on the Project and persistent failure to carry <br />out the Work in accordance with the Contract Documents, <br />14.6.8 Of liquidated damages payable by the CONTRACTOR, or <br />14.6.9 Of any other violation of, or failure to comply with provisions of the Contract Documents. <br />14.7 Prior to Final Acceptance the CITY with the concurrence of the CONTRACTOR, may use any completed or <br />substantially completed portions of the Work. Such use shall not constitute an acceptance of such portions of the Work. <br />14.8 The CITY shall have the right to enter the premises for the purpose of doing Work not covered by the Contract <br />Documents. This provision shall not be construed as relieving the CONTRACTOR of the sole responsibility for the care <br />and protection of the Work, or the restoration of any damaged Work except such as may be caused by agents or <br />employees of the CITY. <br />14.9 Upon completion and acceptance of the Work the CITY shall issue a certificate attached to the final payment <br />request that the Work has been accepted by them under the conditions of the Contract Documents. The entire balance <br />found to be due the CONTRACTOR, including the retained percentages, but except such sums as may be lawfully <br />retained by the CITY, shall be paid to the CONTRACTOR within sixty (60) days of completion and acceptance of the <br />Work. <br />Acceptance of Final Pavment as Release <br />14.11 The Acceptance by the CONTRACTOR of final payment shall be and shall operate as a release to the CITY and <br />a waiver of all claims and all liability to the CONTRACTOR other than claims in stated amounts as may be specifically <br />excepted by the CONTRACTOR for all things done or furnished in connection with the Work and for every act and <br />neglect of the CITY and others relating to or arising out of this Work. Any payment, however, final or otherwise, shall <br />not release the CONTRACTOR of their sureties from any obligations under the Contract Documents or the Performance <br />Bond and Payment Bonds. <br />ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION <br />15.1 The CITY may, at any time and without cause, suspend the Work or any portion thereof for a period of not more <br />than ninety (90) days by notice in writing to the CONTRACTOR which shall fix the date on which Work shall be <br />resumed. The CONTRACTOR will be allowed an increase in the Contract Price or an extension of the Contract Time, <br />or both, directly attributable to any suspension if they make a claim therefor as provided in Articles 11 and 12. <br />Work Durini4 Inclement Weather <br />00710-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.