Laserfiche WebLink
1 <br />u <br />This document has important legal consequences; consultation with an attorney is encouraged with respect to its use or <br />modification. This document should be adapted to the particular circumstances of the contemplated Project and the <br />Controlling Law. <br />STANDARD <br />GENERAL CONDITIONS <br />OF THE <br />CONSTRUCTION CONTRACT <br />Prepared by <br />ENGINEERS JOINT CONTRACT DOCUMENTS COMMITTEE <br />' and <br />,11 Issued and Published Jointly By <br />National Society of ARNMRS <br />4` Professional Engineers <br />' AMERICAN CONSULTING <br />PrOessional Engineers in Private Practice AMERICAN SOCIETY OF <br />CIVIL ENGINEERS <br />ENGINEERS COUNCIL <br />PROFESSIONAL ENGINEERS IN PRIVATE PRACTICE <br />' a practice division of the <br />NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS <br />' AMERICAN CONSULTING ENGINEERS COUNCIL <br />' AMERICAN SOCIETY OF CIVIL ENGINEERS <br />' This document has been approved and endorsed by <br />The Associated General M,�;, Contractors of America <br />Construction Specifications Institute <br />rw.oc,yv <br />These General Conditions have been prepared for use with the Owner- Contractor Agreements (No. 1910 -8 -A -1 or 1910- <br />8-=-2) (1996 Editions). Their provisions are interrelated and a change in one may necessitate a change in the other. <br />Comments concerning their usage are contained in the EICDC User's Guide (No. 1910 -50). For guidance in the <br />preparation of Supplementary Conditions, see Guide to the Preparation of Supplementary Conditions (No. 1910 -17) <br />(1996 Edition). r <br />EJCDC No. 1910 -8 (1996 Edition) <br />