My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications & Plans
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Specifications & Plans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:04:39 AM
Creation date
1/19/2011 10:07:00 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 18.3 Upon acceptance of a Bid and award of the Contract, the successful Bidder shall deliver <br />the executed Contract, along with required bonds and any other items requested, to the <br />Owner within 10 days. Failure to do so will be deemed as a breach of agreement by the <br />Bidder and result in forfeiture of bid security as described in the Instructions to Bidders. <br />' 18.4 The Owner reserves the right to hold all proposals and bid guarantees for a period not to <br />exceed 90 days after the date of bid opening stated in the Advertisement for Bids. <br />18.5 The award of the contract, if it is awarded, will be to the lowest responsible total base <br />bidder whose qualifications indicate the award will be to the best interest of the Owner <br />and whose proposal shall comply with the requirements of the Contract Documents. Time <br />is of the essence for this project and the time limits set in the proposal, if set by the <br />' bidder, will be accorded weight by the Owner in the determination of the best proposal. <br />In no case will the award be made until all necessary investigations have been made into <br />the responsibility of the low bidder and the Owner is satisfied that the bidder is qualified <br />' to do the Work and have the necessary organization, capital and equipment to carry out <br />the provisions of the contract to the satisfaction of the Owner within the time specified. <br />18.7 If the Contractor feels that a problem exists either prior to, or during the bid opening, <br />he /she shall contact the City (within 24 hours of the bid opening) and follow the City's <br />current policy for bid protests. <br />' 18.8 The Owner reserves the right to award as a total contract any combination of the Unit <br />Price Bid Schedule Items that would be in the best interest of the Owner. <br />19. CASH ALLOWANCES <br />19.1 The Bidder is advised that a space is provided in the Bid Form, Document 00300, for this <br />purpose only. The Contractor shall not proceed on any additional work to be covered by <br />allowances until authorized in writing by the Engineer. Such work shall be approved by <br />the Owner, shall be within the scope of work defined by this Contract and shall not <br />' exceed the amount indicated in the Bid Form. Any amount remaining in the Cash <br />Allowance will be retained by the Owner. <br />IEND OF DOCUMENT <br />1 06/05 00100 -7 03- 4138.B <br />
The URL can be used to link to this page
Your browser does not support the video tag.