Laserfiche WebLink
' 1.04 DESCRIPTION <br />A. Concrete shall be of Portland cement, ASTM C -94, fine aggregate, coarse aggregate, water <br />' and admixtures as specified and shall be ready- mixed, or transit -mixed concrete. All <br />constituents, including admixture, shall be batched at the central batch plant. <br />' B. Reinforced concrete shall conform to ACI Specification 318 -89 or latest revision. <br />C. Field testing and inspection services required will be provided by the Contractor. Cost of <br />such work, except as specifically stated otherwise, will be paid for by the Contractor. <br />Methods of test will comply in detail with the latest applicable ASTM Methods of Testing. <br />D. Samples of constituents and of concrete as placed will be subjected to laboratory tests. <br />Materials incorporated in the work shall conform to approved samples. <br />E. Under special circumstances, the Engineer may allow minor deviations from the material <br />' requirements specified, provided the resulting concrete quality is not adversely affected or <br />provided a suitable adjustment in cement content is made to compensate for such <br />deviations without cost to the Owner. <br />' 1.05 SUBMITTALS <br />A. Submit, as provided in the General Conditions and Section 01340, shop drawings showing <br />' placement of forms, form joints, major inserts and blockouts. <br />1.06 QUALITY ASSURANCE <br />' A. The actual acceptance of aggregates and development of mix proportions to produce <br />concrete conforming to the specific requirements shall be determined by means of prior <br />laboratory tests made by the Concrete Supplier or the Contractor at his expense with the <br />' constituents to be used on the work. <br />B. The Concrete Supplier shall submit through the Contractor to the Engineer for approval the <br />concrete mix he intends to use, designed within the limits of these specifications, listing the <br />brand of cement, source and results of tests of aggregates and admixtures not later than 14 <br />days prior to the beginning of placing concrete. <br />' C. The limiting strengths, water - cement ratios and cement factors as shown on (Table A) shall <br />apply. Maximum water - cement (4/4) for structures shall be 0.53 by weight. <br />' <br />TABLE A <br />Minimum Maximum Net <br />Minimum <br />Comp. Str. Water Content <br />Cement Factor <br />' <br />psi at 28 days gals /100 Ibs* <br />100 lbs /cu yd ** <br />2500 7.4 <br />4.3 <br />' <br />3000 7.0 <br />4.8 <br />3500 6.4 <br />5.64 <br />4000 5.85 <br />5.64 <br />' <br />*Maximum; decrease if possible. This represents total water in mix at time of mixing, <br />including free water on aggregates, and water in admixture solution. <br />' <br />* *Minimum; increase as necessary to meet other requirements. <br />"controlled" <br />These cement factors apply <br />to concrete subject to specific inspection. <br />06/05 <br />03300 -2 <br />03- 4138.B <br />