My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 06/05 <br />D. Applicable Standard Specifications: The CONTRACTOR shall construct the WORK <br />specified herein in accordance with the requirements of the Contract Documents and the <br />referenced portion of those referenced codes, standards, and specifications listed herein; <br />except, that wherever references to "Standard Specifications" are made, the provisions <br />therein for measurement and payment shall not apply. <br />E. References herein to "OSHA Regulations for Construction" shall mean Title 29, Part <br />1926, Construction Safety and Health Regulations, Code of Federal Regulations (OSHA), <br />including all changes and amendments thereto. <br />F. References herein to "OSHA Standards" shall mean Title 29, Part 1910, Occupational <br />Safety and Health Standards, Code of Federal Regulations (OSHA), including all changes <br />and amendments hereto. <br />TRADE NAMES AND ALTERNATIVES <br />A. For convenience in designation in the Contract Documents, materials to be incorporated <br />in the WORK may be designated under a trade name or the name of a manufacturer and <br />its catalog information. The use of alternative material that is equal in quality and of the <br />required characteristics for the purpose intended will be permitted, subject to the <br />following requirements: <br />1. The burden of proof as to the quality and suitability of such alternative <br />equipment, products, or other materials shall be upon the CONTRACTOR. <br />2. The ENGINEER will be the sole judge as to the comparative quality and <br />suitability of such alternative equipment, products, or other materials and its <br />decisions shall be final. <br />3. Base Bid requirements outlined in document 00400 - Supplement to Bid Form, <br />shall supersede any language contained hereinafter. <br />B. Whenever in the Contract Documents the name or the name and address of the <br />manufacturer or distributor is given for a product or other material, or if any other source <br />of a product or material is indicated therefore, such information is given for the <br />convenience of the CONTRACTOR only, and no limit, restriction, or direction is <br />indicated or intended thereby, nor is the accuracy or reliability of such information <br />guaranteed. It shall be the responsibility of the CONTRACTOR to determine the <br />accurate identity and location of any such manufacturer, distributor, or other source of <br />any product or material called for in the Contract Documents. <br />C. The CONTRACTOR may offer any material, process, or equipment, which it considers <br />equivalent to that, indicated. Unless otherwise authorized in writing by the ENGINEER, <br />the substantiation of offers of equivalency must be submitted within 30 days after <br />execution of the Agreement. The CONTRACTOR, at its sole expense, shall furnish data <br />concerning items it has offered as equivalent to those specified. The CONTRACTOR <br />shall have the material as required by the ENGINEER to determine that the quality, <br />strength, physical, chemical, or other characteristics, including durability, finish, <br />efficiency, dimensions, service, and suitability are such that the items will fulfill its <br />intended function. Installation and use of a substitute item shall not be made until <br />accepted by the ENGINEER. If a substitute offered by the CONTRACTOR is found to <br />be not equal to the specified material, the CONTRACTOR shall furnish and install the <br />specified material. <br />01090 -2 03- 4138.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.