My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.03 TEMPORARY WATER <br />A. Arrange with the Owner to provide water for construction purposes. <br />B. Install branch piping with taps located so that water is available throughout the <br />construction by the use of hoses. <br />C. Install at each and every connection to the Owner water supply a backflow preventor <br />meeting the requirements of ANSI A40.6, latest revision. Contractor shall be required to <br />meter all water used. <br />2.04 TEMPORARY SANITARY FACILITIES <br />A. Provide sanitary facilities in compliance with laws and regulations. <br />B. Service, clean and maintain facilities and enclosures. <br />2.05 TEMPORARY HEAT AND VENTILATION <br />A. Provide temporary heat and ventilation as required to maintain adequate environmental <br />conditions to facilitate progress of the Work, to meet specified minimum conditions for <br />the installation of materials, and to protect materials and finishes from damage due to <br />temperature or humidity. <br />B. Provide adequate forced ventilation of enclosed areas for curing of installed materials, to <br />disperse humidity, and to prevent hazardous accumulations of dust, fumes, vapors or <br />gases. <br />C. Portable heaters shall be standard approved units complete with controls. <br />D. Pay all costs of installation, maintenance, operation and removal, and for fuel consumed. <br />E. Provide connections to existing facilities, extend and supplement with temporary units as <br />required to comply with requirements. Pay all costs of installation, maintenance, <br />operation and removal. Owner will pay costs of fuel used from the existing system. <br />2.06 TEMPORARY TELEPHONE SERVICE <br />A. Arrange with local telephone service company, provide direct line telephone service at <br />the construction site for the use of personnel and employees. Service required: <br />1. One direct line instrument in Contractor's Field Office for Dade County. <br />2. One direct line instrument in Field Office of Engineer with local access from <br />Dade County. <br />3. One direct line facsimile (FAX) machine in Contractor's Field Office. <br />4. Other instruments at the option of the Contractor, or as required by regulations. <br />06/05 01510 -2 03 -41383 <br />
The URL can be used to link to this page
Your browser does not support the video tag.