My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Immediately on delivery, inspect shipments to assure compliance with <br />requirements of Contract Documents and approved submittals, and that Products <br />are properly protected and undamaged. <br />B. Provide equipment and personnel to handle Products by methods to prevent soiling or <br />' damage to Products or packaging. <br />1.06 STORAGE AND PROTECTION <br />' A. The Contractor shall furnish a covered, weather protected storage structure providing a <br />clean, dry, non - corrosive environment for all mechanical equipment, valves, electrical and <br />instrumentation equipment, and special equipment to be incorporated into this project. <br />Storage of equipment shall be performed to allow easy access and be in strict accordance <br />with the "instructions for storage" of each equipment supplier and manufacturer including <br />weather/humidity protection, connection of heaters, placing of storage lubricants in <br />equipment, blocking, or skid storage, etc. Corroded, damaged or deteriorated equipment <br />and parts shall be replaced before acceptance of the project. Equipment and materials not <br />properly stored will not be included in a payment estimate. <br />' B. Store Products in accordance with manufacturer's instructions, with seals and labels intact <br />and legible. <br />1. Store products subject to damage by the elements in weather -tight enclosures. <br />2. Maintain temperature and humidity within the ranges required by manufacturer's <br />instructions. <br />3. Store fabricated products above the ground on blocking or skids, prevent soiling <br />or staining. Cover products which are subject to deterioration with impervious <br />sheet coverings, provide adequate ventilation to avoid condensation. <br />4. Store loose granular materials in a well drained area on solid surfaces to prevent <br />mixing with foreign matter. <br />5. All unlabeled or improperly labeled materials shall be removed from the project <br />s ite. <br />1 C. All materials and equipment to be incorporated in the work shall be handled and stored by <br />the Contractor before, during, and after shipment in a manner to prevent warping, <br />twisting, bending, breaking, chipping, rusting, and any injury, theft or damage of any kind <br />whatsoever to the material or equipment. <br />D. Cement, sand and lime shall be stored under a roof and off the ground and shall be kept <br />completely dry at all times. All structural and miscellaneous steel, and reinforcing steel <br />shall be stored off the ground or otherwise to prevent accumulations of dirt or grease, and <br />to minimize rusting. Brick, block and similar masonry products shall be handled and <br />' stored in a manner to reduce breakage, chipping, cracking, and spalling to a minimum. <br />I <br />1 06/05 01600 -3 03- 41383 <br />
The URL can be used to link to this page
Your browser does not support the video tag.