My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.09 WARRANTY <br />A. For all major pieces of equipment, submit a warranty from the equipment manufacturer. <br />1.10 SPARE PARTS <br />A. Spare parts for certain equipment provided under Division I1 through 16 have been <br />specified in the pertinent sections of the Specifications. The Contractor shall collect and <br />store all spare parts so required in an area to be designated by the Engineer. In addition, <br />the Contractor shall furnish to the Engineer an inventory listing all spare parts, the <br />equipment they are associated with, the name and address of the supplier, and the <br />delivered cost of each item. Copies of actual invoices for each item shall be furnished with <br />the inventory to substantiate the delivered cost. <br />1.11 GREASE, OIL AND FUEL <br />A. All grease, oil and fuel required for testing of equipment shall be furnished with the <br />respective equipment. The Owner shall be furnished with a year's supply of required <br />lubricants including grease and oil of the type recommended b the manufacturer with each <br />item of the equipment supplied under Division 1 1 through 16. <br />B. The Contractor shall be responsible for changing the oil in all drives and intermediate <br />drives of each mechanical equipment after initial break -in of the equipment, which in no <br />event shall be any longer than three weeks of operation. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION <br />06/05 01600 -6 03- 4138.B <br />
The URL can be used to link to this page
Your browser does not support the video tag.