My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Record Specifications: Maintain one complete copy of the Project Manual, including <br />addenda, and one copy of other written construction documents such as Change Orders <br />and modifications issued in printed form during construction. <br />1. Mark these documents to show substantial variations in actual Work performed <br />in comparison with the text of the Specifications and modifications. <br />2. Give particular attention to substitutions, selection of options and similar <br />information on elements that are concealed or cannot otherwise be readily <br />' discerned later by direct observation. <br />3. Note related record drawing information and Product Data. <br />D. Record Product Data: Maintain one copy of each Product Data submittal. <br />1 5. Signature of Contractor or his authorized representative. <br />1 06/05 01700 -4 03- 4138.13 <br />1. Mark these documents to show significant variations in actual Work performed <br />in comparison with information submitted. Include variations in products <br />delivered to the site, and from the manufacturer's installation instructions and <br />recommendations. <br />2. Give particular attention to concealed products and portions of the Work that <br />cannot otherwise be readily discerned later by direct observation. <br />' <br />3. Note related Change Orders and mark -up of record drawings and Specifications. <br />' <br />E. Record Sample Submitted: Immediately prior to the date or dates of Substantial <br />Completion, the Contractor will meet at the site with the Engineer and the Owner to <br />determine which of the submitted Samples that have been maintained during progress of <br />the Work are to be transmitted to the Owner for record purposes. Comply with delivery to <br />the Owner's Sample storage area. <br />F. Miscellaneous Record Submittals: Refer to other Specification Sections for requirements <br />of miscellaneous record - keeping and submittals in connection with actual performance of <br />the Work. <br />G. At Contract close -out, deliver one copy of Record Documents to Engineer for Owner. <br />Accompany submittal with transmittal letter in duplicate containing the following <br />information: <br />' <br />1. Date. <br />2. Project title and number. <br />3. Contractor's name and address. <br />' <br />4. Title and number of each Record Document. <br />1 5. Signature of Contractor or his authorized representative. <br />1 06/05 01700 -4 03- 4138.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.