Laserfiche WebLink
Median Fencing Improvements <br />UNIT PRICE BID SCHEDULE <br />Item Estimated <br />No. Description Quantity Unit Unit Price Estimated Amount <br />I. FENCING <br />1 Furnish and Install Three -Foot (3') High Black <br />Metal Picket Fence. <br />2 Repair /Reset Three -Foot (3') High Black Metal <br />Picket Fence. <br />3 Furnish and Install Six -Foot (6') High Black <br />Metal Picket Fence. (Future Installation) <br />4 Furnish and Install Eight -Foot (8') High Black <br />Metal Picket Fence. (Future Installation) <br />SUBTOTAL FENCING <br />II. GENERAL <br />5 Maintenance of Traffic <br />6 Mobilization and Demobilization of all <br />equipment and personnel (10% of Subtotal) <br />7 Contingency (10% of Subtotal) <br />SUBTOTAL GENERAL <br />GRAND TOTAL (Items 1 -7) <br />�'L �" , �) "CA -V� -V� �. C,0 <br />ignature) <br />1,175 LF $ ,::;J W $ V0 <br />16 LF $ `I 0.r0V $ .Z10 <br />500 LF $ 52.!50 $ --7JA <br />500 LF $ —7_Z• '0© 0L <br />$ IY1 �L) <br />1 LS $ __? S CU00 $ .-I S"O (C) <br />1 LS $ S-CW.'° $ SZDZ <br />1 LS $ K), XD' CC' $ t 0,01c-"Z <br />$ 12 SDO . D'� <br />$ k�;Dtu�.flm <br />OU <br />te) <br />06/05 00300 -2 03- 4138.B <br />